My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-003999 - replace tank & drainfield
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4720 Watertown Road - 31-118-23-22-0005
>
Septic
>
1991-003999 - replace tank & drainfield
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:43 PM
Creation date
12/23/2019 12:24:24 PM
Metadata
Fields
Template:
x Address Old
House Number
4720
Street Name
Watertown
Street Type
Road
Address
4720 Watertown Road
Document Type
Septic
PIN
3111823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM END PERFORATION OF A PERFORATED LATERAL <br /> , Cava• <br /> • Topsoil <br /> , l <br /> 1. Select number of perforated laterals ---..- .-- • <br /> 'Lane ofel na <br /> ONinln• roblc f' <br /> • Leomy Send Lour not layer p w,wow s. <br /> • . • with •• resin pope') <br /> 2. Select perforation spacing = 0 feet ,miry ctrtratl• mi Per tor•lion Wiled Ilerisonl•..., <br /> ..' <br /> Into C•p Near Top <br /> /�Plus �,-Al Lies' f2e Is Edge <br /> 3. Since perforations should not be placed closer than 1 ft. to leld Roc ` • , of Rock Loper <br /> oaned al <br /> the edge of the rock layer (see diagram), subtract 2 ft. from dean sand Loper -Bottorolof tferal <br /> Bottom a/.LLtool <br /> the rock layer length. <br /> �C - -Zorlylnal Soil Properly ScorllNd <br /> JBefore Placing Bond •Lays, <br /> Rock layer length - 2 ft. =3: feet <br /> TABLE OF PERFORATION DISCHARGES IN GPM <br /> 4. Determine the number of spaces between perforations. Head Perforation diameter(inches) <br /> Divide the length above by perforation spacing and round <br /> down to nearest whole number. '/. '/• <br /> C 1.9a 0.56 (c`Q <br /> ft. 3 ft. = 17 1.5 0.69 0.90 <br /> Length perf. spacing = spaces 2.0b 0.80 1.04 <br /> (#3) (#2) 2.5 0.89 1.17 <br /> 3.0 0.98 1.28 <br /> 5. Number of perforations is equal to one plus the number of <br /> 4.0 1.13 1.47 <br /> perforation spaces . 5.0 1.26 1.65 <br /> aUse 1.0 foot of head for residential systems. <br /> 12 spaces + 1 = perforations per lateral bUse 2.0 feet of head for other establishments <br /> 6. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. <br /> 3 I STable 2 <br /> X =Sperforations Maximum allowable number of quater inch perforations per <br /> laterals perfs/lateral lateral to guarantee<10%Discharge variation <br /> pC{Ofet1nn'4e`l14 1.25 inch 1.5 inch 2.0 inch <br /> (r moi) <br /> 7. Determine required flow rate by multiplying 14 18 28 <br /> number of perforations by flow per perforation 13 ��1Z_, 26 <br /> 3.3 12 16 25 <br /> / 4.0 11 15 23 <br /> 0-`7' 0,747 il 5.0 10 14 22 <br /> pens x gpm/pert 7U gpm. <br /> • <br /> 8. If laterals are connected to header pipe as shown on upper µ,,aa "ie" " " '"`�"K. <br /> "'"" oo"'" " <br /> example, select minimum required lateral diameter from . <br /> table 2; enter table with perforation spacing and number _•_ --�-�� <br /> of perforations per lateral. Select minimum diameter for �,---��r • <br /> perforated lateral = inches ,�,,,,-aro <br /> 9. If perforated lateral system is attached to manifold pipe near <br /> the center, as in lower example, perforated lateral length and lwr:�:•r:eM <br /> number of perforations per lateral will be approximately one """'"""" <br /> half of that in # 6. Using these values, select minimum '� ' <br /> diameter for perforated lateral from table 2 --�` -x•:- -- <br /> perforated lateral = . l /7, inches `.r---f"� • ' 7r <br /> .r - <br /> ,,r <br /> . rtN---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.