My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Repair of Septic System
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4705 Watertown Rd - 31-118-23-22-0003
>
Septic
>
Repair of Septic System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:42 PM
Creation date
12/23/2019 11:08:55 AM
Metadata
Fields
Template:
x Address Old
House Number
4705
Street Name
Watertown
Street Type
Road
Address
4705 Watertown Road
Document Type
Septic
PIN
3111823220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. 0 k <br /> o oCITY of ORONO <br /> A 1/4�1' ,"n Municipal Offices <br /> `� fil 4, <br /> � ' :, 1 4, Street Address: Mailing Address: <br /> 9kEslIdiv 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> January 6, 1994 <br /> Mr. Ned Butterfield <br /> 4705 Watertown Road <br /> Maple Plain, Minnesota 55359 <br /> Dear Mr. Butterfield: <br /> Due to the extremely wet year, we realize that the required repair of your septic system may <br /> have been difficult to complete last summer. This is a reminder that the septic system repair <br /> will be required next year. <br /> A licensed-septic contractor must get a permit from the City of Orono by July 15, 1994 for the <br /> repair of your septic system. The procedure for completing septic system repairs is shown <br /> below. Please contact me at the City offices if there are any questions. <br /> PROCEDURE FOR SEPTIC SYSTEM REPAIR <br /> 1. Hire a Site Evaluator/System Designer to do the soil testing and system design. <br /> 2. Submit the design to the City for approval. <br /> 3. Once the design is approved, have one or more contractors bid on the approved design. <br /> 4. The contractor you choose should then obtain a permit from the City before starting work. <br /> He will call the City for the required inspections. <br /> Sincerely, <br /> .5264 . , / _ . g____.-- <br /> Stephen Weckman <br /> On-Site Systems Manager <br /> SW/ch <br /> Enc. Septic Report <br /> List of Septic Contractors and Site Evaluators/Designers <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.