<br />Temporary Erosion Control and Sequencing
<br />1. Install perimeter control fencing per the standard detail plates. No more than
<br />600 linear feet of silt fence should be continuous and collecting at one point.
<br />Undulate the silt fence or use "simles" or crescents of silt fence.
<br />2. Use horizontal slope grading
<br />3. Install erosion control around any temporary dirt stockpile areas.
<br />4. All septic areas to be fenced off for protection. Protection to extend a
<br />minimum of 20' outside of septic areas.
<br />5. The contractor for the project shall inspect all erosion control BMP's after
<br />each rainfall and repair as necessary and remove sediment from silf fences
<br />if it reaches 1/3 capacity.
<br />6. The contractor shall schedule his operations to minimize the amount of
<br />disturbed area at any given time. The contractor shall limit his activities
<br />to the grading limits as shown.
<br />7. Remove all temporary BMP's once the site has reached final stabilization (a
<br />uniform perennial vegetative cover with a density of 70 percent over all pervious
<br />surface areas).
<br />Permanent Erosion Control
<br />1. All exposed soils on site must be stabilized with in 3 days:
<br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored
<br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas
<br />of concentrated flows consists of erosion blankets and seed.
<br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for
<br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21
<br />days. Also open stockpiles need to have temporary stabilization if they are to
<br />remain inactive for more than 7 days.
<br />(D
<br />c� CO
<br />a�
<br />EED
<br />T-
<br />0 0
<br />�Z
<br />00 U)
<br />T-- J
<br />W Q:
<br />W
<br />O O
<br />O
<br />0 T-
<br />r' 0
<br />O T-
<br />0 99 9 TEST(
<br />(9 5.1) '`O( r) i° HOLE98a
<br />;N k991.0) `g.; P)
<br />(/ L-992- (99
<br />(9s3. .994-- $
<br />•. � (9 2 . S
<br />----39 -� {996.2 _ Za.s F
<br />G'E
<br />m F1A�R= b )
<br />X7.0
<br />ti
<br />LO
<br />Ll
<br />1.90
<br />LU
<br />a� C/)
<br />Og Z
<br />0
<br />H J
<br />JW ��
<br />Z (
<br />f– �
<br />CA
<br />LU
<br />qo,6- ZE'
<br />STORM WATER POLLUTION PREVENTION PLAN FOR
<br />THOMAS A. CUSICK
<br />OF TRACT B, R. L. S. NO. 1098
<br />HENNEPIN COUNTY, MINNESOTA
<br />0 30 60
<br />1201
<br />SCALE IN FEET
<br />X4.7 Off► of Orono
<br />Planning & Zoning Plan Review
<br />Site Plan Review Date: --=�
<br />PROVED
<br />W PROF`OSED SILT FENCE oEr
<br />rAOVED WITH REVISIONS (see note
<br />El DNIED
<br />2 Staff: l�dAV/
<br />(9 1.3
<br />>>
<br />�1) -(95.6) I I
<br />CID.
<br />QO
<br />0 Q
<br />\a
<br />E I I I ft
<br />�o k9so > , 1 I.-
<br />- f , (961.5)
<br />tea" Z� (�Tj) $)
<br />tp
<br />ogi< \ I I I �970
<br />^�* N '969.2) ` 15
<br />ICD
<br />(J �A�
<br />I
<br />v 0 I I
<br />66.6
<br />AR
<br />LJ
<br />� 1
<br />At �s0
<br />- �I Ic?a�,t r-; � N X50 3'Op �r � 317 S4
<br />;NORM WATER POLLUTION PREVENTION PLAN BEFORE AI .L. �-.. G _ ON•_ TRUCTION W 317 44 meas
<br />3p �,� ed
<br />1. The following storm water pollution prevention measures are shown S SID
<br />on the plans and shall be implemented prior to construction: 3. Notification 1098
<br />* Install silt fence around the perimeter of areas to be graded as * If sediment from the site is observed on adjacent streets or other properties,
<br />shown on the storm water pollution plan. the contractor shall remove the sediment within 24 hours of detection or notification.
<br />* All temporary stockpiles must have silt fence around them to trap * If sediment from the site is observed on adjacent streets or other properties, the
<br />sediment.
<br />* inspector shall identify the source and discharge location of the sediment and instruct
<br />Phase grading work to minimize the duration that any disturbed soil the contractor to implement additional erosion and sediment controls at those
<br />is exposed. locations to prevent future discharges.
<br />* Seed and mulch must be applied within 72 hours after rough gradingis *'If building materials, chemicals, or general refuse is being used, stored, disposed
<br />complete.
<br />* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. of, otherwise managed inappropriately, the contractor shall correct such defects
<br />* Remove any sediment that has been tracked onto public or private streets within hours of detection or notification.
<br />within hours. * If excess sive sediments or debris are observed at the flared end section outfalls,
<br />* Remove any spill of fuel, oil, or other chemical immediately upon detection. the inspector shall determine the source and discharge locations of such materials.
<br />* Store construction materials in an orderly manner. If the discharge has occurred on the property, the contractor shatl remove the
<br />* Repair silt fences, rock construction entrances, and other erosion and sediments and debris within 24 hours of notification and correct the source of
<br />sediment controls as needed. such materials as directed by the inspector.
<br />2. Storm Water Pollution Prevention After Construction
<br />EXISTING LEGAL DESCRIPTION:
<br />The contractor shall implement the following storm water pollution prevention Tract B, Registered Land Survey No. 1098, files of
<br />measures after construction: Registrar of Titles, Hennepin County, Minnesota
<br />* All distrubed areas without permanent impermeable surfaces will be
<br />vegetated for final stabilization.
<br />* Silt fence and other erosion and sediment control devices will be removed This survey shows the boundaries of the above described
<br />after vegetation is established property, and the location of an existing house, porch,
<br />* Contractor s1hall maintain a construction activity Ion with d–ntes of major
<br />driveway, deck and oilier visible hardcover' thereon, and
<br />grading activities, dates grading stops and spills. the proposed location of a propostru eauu iun- li uot:� 0131.
<br />* Keep SWPPP and inspection log accessible on site.
<br />purport to show any other improvements or encroachments.
<br />6 : Iron rnarker found
<br />(998.3) : Existing spot elevation, mean sea level datum
<br />--968-- : Existing contour line
<br />Bearings shown are based upon an assumed datum
<br />JUDICIAL 41
<br />—
<br />rn
<br />SILT FENCE
<br />HEAVY DUTY
<br />F
<br />OO
<br />EXISTIN
<br />(V
<br />CONCRET
<br />...........
<br />......0:3_.... --" --
<br />ti
<br />LO
<br />Ll
<br />1.90
<br />LU
<br />a� C/)
<br />Og Z
<br />0
<br />H J
<br />JW ��
<br />Z (
<br />f– �
<br />CA
<br />LU
<br />qo,6- ZE'
<br />STORM WATER POLLUTION PREVENTION PLAN FOR
<br />THOMAS A. CUSICK
<br />OF TRACT B, R. L. S. NO. 1098
<br />HENNEPIN COUNTY, MINNESOTA
<br />0 30 60
<br />1201
<br />SCALE IN FEET
<br />X4.7 Off► of Orono
<br />Planning & Zoning Plan Review
<br />Site Plan Review Date: --=�
<br />PROVED
<br />W PROF`OSED SILT FENCE oEr
<br />rAOVED WITH REVISIONS (see note
<br />El DNIED
<br />2 Staff: l�dAV/
<br />(9 1.3
<br />>>
<br />�1) -(95.6) I I
<br />CID.
<br />QO
<br />0 Q
<br />\a
<br />E I I I ft
<br />�o k9so > , 1 I.-
<br />- f , (961.5)
<br />tea" Z� (�Tj) $)
<br />tp
<br />ogi< \ I I I �970
<br />^�* N '969.2) ` 15
<br />ICD
<br />(J �A�
<br />I
<br />v 0 I I
<br />66.6
<br />AR
<br />LJ
<br />� 1
<br />At �s0
<br />- �I Ic?a�,t r-; � N X50 3'Op �r � 317 S4
<br />;NORM WATER POLLUTION PREVENTION PLAN BEFORE AI .L. �-.. G _ ON•_ TRUCTION W 317 44 meas
<br />3p �,� ed
<br />1. The following storm water pollution prevention measures are shown S SID
<br />on the plans and shall be implemented prior to construction: 3. Notification 1098
<br />* Install silt fence around the perimeter of areas to be graded as * If sediment from the site is observed on adjacent streets or other properties,
<br />shown on the storm water pollution plan. the contractor shall remove the sediment within 24 hours of detection or notification.
<br />* All temporary stockpiles must have silt fence around them to trap * If sediment from the site is observed on adjacent streets or other properties, the
<br />sediment.
<br />* inspector shall identify the source and discharge location of the sediment and instruct
<br />Phase grading work to minimize the duration that any disturbed soil the contractor to implement additional erosion and sediment controls at those
<br />is exposed. locations to prevent future discharges.
<br />* Seed and mulch must be applied within 72 hours after rough gradingis *'If building materials, chemicals, or general refuse is being used, stored, disposed
<br />complete.
<br />* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. of, otherwise managed inappropriately, the contractor shall correct such defects
<br />* Remove any sediment that has been tracked onto public or private streets within hours of detection or notification.
<br />within hours. * If excess sive sediments or debris are observed at the flared end section outfalls,
<br />* Remove any spill of fuel, oil, or other chemical immediately upon detection. the inspector shall determine the source and discharge locations of such materials.
<br />* Store construction materials in an orderly manner. If the discharge has occurred on the property, the contractor shatl remove the
<br />* Repair silt fences, rock construction entrances, and other erosion and sediments and debris within 24 hours of notification and correct the source of
<br />sediment controls as needed. such materials as directed by the inspector.
<br />2. Storm Water Pollution Prevention After Construction
<br />EXISTING LEGAL DESCRIPTION:
<br />The contractor shall implement the following storm water pollution prevention Tract B, Registered Land Survey No. 1098, files of
<br />measures after construction: Registrar of Titles, Hennepin County, Minnesota
<br />* All distrubed areas without permanent impermeable surfaces will be
<br />vegetated for final stabilization.
<br />* Silt fence and other erosion and sediment control devices will be removed This survey shows the boundaries of the above described
<br />after vegetation is established property, and the location of an existing house, porch,
<br />* Contractor s1hall maintain a construction activity Ion with d–ntes of major
<br />driveway, deck and oilier visible hardcover' thereon, and
<br />grading activities, dates grading stops and spills. the proposed location of a propostru eauu iun- li uot:� 0131.
<br />* Keep SWPPP and inspection log accessible on site.
<br />purport to show any other improvements or encroachments.
<br />6 : Iron rnarker found
<br />(998.3) : Existing spot elevation, mean sea level datum
<br />--968-- : Existing contour line
<br />Bearings shown are based upon an assumed datum
<br />JUDICIAL 41
<br />—
<br />LANDMAR
<br />SILT FENCE
<br />HEAVY DUTY
<br />F
<br />OO
<br />00
<br />U1 0
<br />W01
<br />O 00
<br />O O
<br />=W
<br />M
<br />m
<br />00
<br />/O-4
<br />N
<br />��04 -0
<br />Z CD
<br />s/
<br />0
<br />QQ��,
<br />161CL
<br />-'
<br />00
<br />J_ I
<br />E Bp,CK L1NDE�
<br />5ppw; T .NOR -TN �1NE
<br />F ER DPIII MARSN
<br />F
<br />I
<br />f-1
<br />ao snr rU+ct++E*T�o Fwa amu:uu rzarnnnc wm.
<br />z nvrnm sa*re+auw.mrt+c aiaorn+�mrr�ncetn.Trswic
<br />ro crnumFr+r oucro via
<br />uNn�r«a, wrr wus, sig <aa�s, erc
<br />—
<br />O
<br />SILT FENCE
<br />HEAVY DUTY
<br />F
<br />��
<br />ERa1C
<br />DESIGNED REVISION DATE DESCRIPTIONI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT SCALE
<br />9-23-09 REVISED ADDITION SHOWN
<br />GRONBERG & ASSOCIATES, INC. WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND 1"=30'
<br />1
<br />DRAWN 2 9-30-09 STORM WATER POLLUTION PREVENTION PLAN CONSULTING ENGINEERS, LAND SURVEYORS THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER AND LAND DATE
<br />SITE PLANNERS SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.
<br />7-14-09
<br />CHECKED 445 N. WILLOW DR. LONG LAKE, MN. 55356