My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999 Site Plan
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
60 Crystal Creek Road - 33-118-23-33-0008
>
Survey
>
1999 Site Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:08 PM
Creation date
12/16/2019 1:53:12 PM
Metadata
Fields
Template:
x Address Old
House Number
60
Street Name
Crystal Creek
Street Type
Road
Address
60 Crystal Creek Road
Document Type
Survey
PIN
3311823330008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01999 Westwood Professional services, Inc. <br />SITE COPY <br />'6s4©34` <br />32.5 <br />L=35. U0 M*26#45NE 476.58 <br />RM <br />o106� m1 7031/Dainage and 1� u / <br />-- — <br />— <br />/ <br />2 ;�tiu , � / 141 erns e <br />i h 23.5 _ , 4 SeptW <br />3sb <br />tl 3.i0o o <br />50 i p o �' existi silt f nce + / <br />/ , <br />76.2 � a m � 4.sb , / <br />vi Lo 1 .21 <br />3.6 vl / <br />i <br />. <br />W I 4 <br />' / 10 <br />I <br />Lo n 1 t <br />\ ,�J 1300/gc1lon e- <br />ELEVA TONS N su -a deep � I cast septic tanks / <br />� �re .location / <br />Lowest floor elev. = 92.1± <br />�- -- / <br />Top of foundation elev. = 100.91 I c <br />!- ench rk. e and ti/ify aseme <br />Garage floor elev. = 100.5E pp of ar ,nom �• __ <br />*Elevations are approximate and may need 10 $$ ev g6to be adjusted in the field. O `�� <br />� U) NE380=4YWE 295.00 <br />25 25 <br />LEGEND <br />Q percolation test hole <br />soil boring <br />- _ — - - exist/ng elevot/on contour <br />92.4 existing spot e%vat/on <br />T492proposed spot elevation <br />Elevct/ons relot/ve and assumed <br />0 Elevations relative to U. S. G S. 1929 N. G. V D. <br />Denotes proposed surface dra/nage <br />_._"Z <br />Beteg are based on assumed data. <br />p pates iron monument set <br />• Denotes iron monument found <br />REVISIONS <br />3/04/99 mound loc. <br />4/28/99 house style <br />JILITWestwood <br />Westwood Professional Services, Inc <br />104 Marty Dr. Suite 3 <br />Buffalo, MN 55313 <br />612 682-2587 <br />13 ump tank <br />x <br />/1 �b6 <br />o� <br />/f0 <br />-4 <br />y�K _ <br />�r i' • <br />CITY 4f 0RO <br />SITE FLAN GRADING PLAN <br />9 APERDVED -Neuf R'S <br />❑ APP O E -D WITH REVISIONS <br />❑ DISAP O4� <br />By <br />TA <br />10 Se)D c <br />Site <br />� b 2 <br />� sb1 Z <br />8.5 x-'68 0 <br />Drainage and- <br />r�f' <br />781 Easement ,� L <br />� � �► <br />10 <br />Drainage and _..c- h ,e __ I <br />u ti/i ty Easement `n <br />L ECRL D�SCR/P TiON.- - <br />Lot 2, Block 2, CRYSTAL CPEEK, according to the recorded <br />plat thereof, Hennepin County, Minnesota. <br />Primary Mound Quantities <br />3/4"-2 1/2" clean rock for rock bed — 23.3E cubic yards <br />Clean Sand fill — 150E cubic yards <br />topsoil for cover — 771 cubic yards <br />Loamy sand for cap — 181 cubic yards <br />**Quantities are approximate and do not include waste <br />4 <br />GRAPHIC SC ALE <br />iso <br />( IN Fl= ) <br />1 inch = 40 ft. <br />I hereby certify that this plan was prepared by me <br />or under my direct supervision and at I am aunder <br />duly register ROFESSIONAL UIR <br />the laws o fie` S�tote�of Minn <br />t �./.7if1/ <br />DATE ? RE <br />DRAWN BCM <br />CHECKED SAG <br />--� �6' . <br />Approximate edge � , \ <br />of Wet/and <br />0 <br />lam, _ irri� <br />Notes.. <br />1. Avoid compaction of mound area before, during and <br />after construction <br />2. Verify before drilling that no septic tanks ar septic areas <br />are within a 50 foot radius of proposed well %cation. <br />(100 feet for shallow well) <br />3. Verify before construction that no shallow wells are with/n <br />100 feet, or deep wells within 50 feet of proposed septic <br />tanks or mound area. <br />4. To extend the l/fe of septic system pump septic tanks a <br />min/mum of every 2 years. <br />5. See attached sheets for add/tionOl construct/on details. <br />6. Soil Classified as Lester loam(LrC) 6-12X s/opes, <br />accord/ng to the U.S. Deportment of Agriculture so/l Survey <br />7. S/te plan prepared by or under the supervision of Bern/e <br />Miller- M.P. C.A. License No. 4,3 <br />Date 1091-,i <br />Septic System Site Pian <br />$t <br />Certificate of Survey <br />PERPARED FOR: DATE <br />2/19/99 <br />Pinar Homes <br />740 East Lake St. JOB NO. <br />99577Wayzata, t1• <br />
The URL can be used to link to this page
Your browser does not support the video tag.