Laserfiche WebLink
El <br />RENO ES CATCH BASIN <br />QD2D <br />DENOTES PROPOSED ELEVATION. <br />X1 011 Z_ . <br />DENOTES EXIS ITING ELEVATION. <br />1024.6 (0 <br />& 1029.0 <br />DENOTES DIRECTION OF DRAINAGE. <br />Z <br />DENOTES WOOD HUB/METAL SPIKE <br />o, <br />DENOTES BITUMINOUS <br />1026.7 <br />DENOTES EXISTING TREE <br />DENOTES PROPOSED RETAINING WALL <br />@ <br />DENOTES EXISTING CONTOUR <br />30 <br />IN FEET <br />I inch = 30 It. <br />� <br />T-1 ACRE LAND SURVEYING goes <br />Oahe, MN 554419 <br />763-238-6278 js.acrelandsurvey- gmail.com <br />10 11 12 13 14 15 16 17 18 19 j 10I1 112 113 114 1115 <br />__LIIL6_117 �118 11 �912 0 <br />IMPERVIOUS SURFACE <br />Total Lot Area .................... 133,2311 sqft. <br />Total Impervious Surface ........ 15,430 sqft. <br />Driveway/ SidewaIk ................. ...... 6,339 sq -1t. <br />House. .......................................... 4,152 sqft. <br />Porch..............................................340 sqft. <br />Pool Area ........ ........................... 3,194 sqft. <br />Concrete .............. ......................... 800 sqft. <br />% of Impervious Surface .................11.1 % <br />00 <br />0 C" <br />z <br />co <br />i- a <br />(vacant) <br />EXIS'PING HOUSE 02.`,.91 <br />9RST FL=1026.0 <br />tJ 102-1.9 <br />CD <br />1023.0 <br />1022.6 <br />1022.8 <br />.70 <br />1021.8 1OZ.2 <br />1021.7N <br />1021 3 p2 :.1024 <br />1020.5 107Z3 <br />1014,9 N <br />........... <br />rp <br />C C, <br />9922 <br />1026.3 <br />CMP -INV <br />FLOOR <br />1028.0 <br />1026.9 <br />TOP OF <br />BLOCK <br />1024.6 (0 <br />& 1029.0 <br />BASEMENT <br />FLOOR <br />o, <br />1026.7 <br />1026.1 <br />@ <br />�0271 <br />1027.3 <br />102 5.8 <br />1028.6 <br />)24.8 <br />-1025.9 <br />7-1 <br />1013.3 <br />011 2 <br />--FIELD SURVEY CONDUCTED ON MAY 23RD, 2012. <br />- BEARiNt'.37"S SHOWN ARE ON ASSUMED DATUM. <br />- CONTRACTOR TO VERIFY HOUSE DIMENSIONS, <br />AND SEWER AND BASEMENT DEPTHS. <br />- FINISHED GRADE 10 FEET FROM PROPOSED BUILDING <br />SHALL BE 0.5 FEET LOWER THAN THE FINISHED GRADE <br />AT THE BUILDING. <br />- FINISHED GRADE ELEVATIONS ARE TO FINISHED <br />SURFACE WITH TURF ESTABLISHMENT. <br />- DRIVEWAYS ARE SHOWN FOR GRAPHIC <br />PURPOSES ONLY. FINAL DRIVEWAY DESIGN AND <br />LOCATION TO BE DETERMINED BY CONTRACTOR <br />C:\Lancl Projects 2008\11159hs-Charltes Cudd\c1wa\11'59g-_b.dwg 6/5'2012 12:2142 PM CDT <br />g f <br />r <br />1014- <br />0 <br />?3,6 1024-9 A <br />1024 <br />T -t 0 <br />5 <br />05 102100() <br />.5 <br />1021.4 <br />(Meas. 5/23/12) <br />AS -BUILT ELEVATIONS <br />GARAGE <br />FLOOR <br />= 1024.0 ............................1023.9 <br />TOP OF <br />BLOCK <br />= 1024.5 ............................1024.4 <br />BASEMENT <br />FLOOR <br />= 1014.8 .............................1014.9 <br />LEGAL DESCRIPTION <br />ot 6. Block 1, GRAHAM HILL PRESERVE, <br />County, Minnesota. <br />I hereby certify that this plan, survey or report was prepared by <br />me or under my direct supervision and that I am a duly Licensed <br />Land Surveyor under the lows of the State of Minnesota. <br />Revised: 6-5-12 <br />Revised: 6-1-12 <br />JO kHUA P. SCHNEIDER Date: 5-30-12 Reg. No. 44655 <br />RECEIVED <br />JIM 0,9 7012 <br />CITY OF ORONO <br />