LEGAL DESCRIPTION:
<br />Lots 3 and 4, Block 1, and Outlot 1, Tillson's Villa Carman.
<br />Subject to an easement for driveway purposes over that part of Outlot 1, Tillson's Villa Carman lying
<br />between the Southeasterly line of Blaine Avenue and the Northwesterly extension of the Northeasterly
<br />line of Lot 2, Block 1, Tillson's Villa Carman, to the Southerly line of Lot 1, Block 1, said addition.
<br />Together with a 15.00 foot wide perpetual easement for ingress and egress purposes lying over, under
<br />and across part of Lot 1, Block 1, Tillson's Villa Carmen, according to the recorded plat thereof,
<br />Hennepin County, Minnesota. The center line of said easement is
<br />described as follows: Commencing at the most northerly corner of said Lot l; thence on an assumed
<br />bearing of South 51 degrees 22 minutes 15 seconds West, along the northwesterly line of said Lot 1, a
<br />distance of 44.00 feet to the point of beginning of said center line; thence South 11
<br />degrees 18 minutes 15 seconds West, a distance of 18.39 feet; thence southwesterly, a distance of 28.21
<br />feet, along a tangential curve, concave to the northwest, having a radius of 135.90 feet, and a central
<br />angle of 11 degrees 53 minutes 30 seconds; thence southwesterly, a distance of 36.18 feet, along a
<br />reverse curve, concave to the southeast, having a radius of 137.62 feet and a central angle of 15 degrees
<br />03 minutes 46 seconds; thence South 08 degrees 07 minutes 59 seconds West, tangent to said curve, a
<br />distance of 15.73 feet; thence southerly, a distance of 5.52 feet, along a tangential curve, concave to the
<br />east, having a radius of 13.00 feet, and a central angle of 24 degrees 21 minutes 00 seconds; thence
<br />South -16 degrees 13 minutes 01 seconds East, tangent to s.aid curve, a distance of 48.89 feet; thence
<br />North 89 degrees 11 minutes 06 seconds East, a distance of 25.61 feet to an easterly line of said Lot 1
<br />and there terminating. The said lines of said
<br />easement shall be prolonged or shortened to terminate on said northwesterly and easterly lines of said
<br />Lot 1.
<br />SCOPE OF WORK:
<br />1. Showing the length and direction of boundary lines of the above legal description. The scope
<br />of our services does not include determining what you own, which is a legal matter. Please
<br />check the legal description with your records or consult with competent legal counsel, if
<br />necessary, to make sure that it is correct, and that any matters of record, such as easements, that you
<br />wish shown on the survey, have been shown.
<br />2. Showing the location of existing improvements we deemed important.
<br />3. Setting new monuments or verifying old monuments to mark the corners of the property.
<br />4. Showing elevations and contours to show the topography of the site. The elevations shown relate
<br />only to the benchmark provided on this survey. Use that benchmark and check at least one other
<br />feature shown on the map when determining other elevations for use on this site.
<br />5. Showing and tabulating hard cover and area of the lot for your review and for the review of such
<br />governmental agencies as may have jurisdiction over hard cover requirements.
<br />6. While we show a proposed location for this home or addition, we are not as familiar with your
<br />proposed plans as you, your architect, or the builder are. review our proposed location of the
<br />improvements and proposed yard grades carefully to verify that they match your plans before
<br />construction begins. also, we are not as familiar with local codes and minimum requirements as the
<br />local building and zoning officials in this community are. Be sure to show this survey to said
<br />officials, or any other officials that may have jurisdiction over the proposed improvements and obtain
<br />their approvals before beginning construction or planning improvements to the property.
<br />7. Note that all building dimensions and building tie dimensions to the property lines, are taken from
<br />the siding and or stucco of the building.
<br />STANDARD SYMBOLS & CONVENTIONS:
<br />" • Denotes 1/2" ID pipe with plastic plug bearing State License Number 42379, set, unless
<br />otherwise noted.
<br />PROPOSED ELEVATIONS
<br />FIRST FLOOR (FINISHED) = 956.80
<br />TOP OF FOUND. (VARIES) = 956.55
<br />BASEMENT FLOOR (VARIES) = 945.60
<br />GARAGE FLOOR = 945.60
<br />TORNADO SHELTER FLOOR = 935.60
<br />GRADING & EROSION CONTROL NOTES:
<br />BEFORE DEMOLITION AND GRADING BEGIN
<br />Install silt fence/bio roll around the perimeter of the construction area.
<br />Sediment control measures must remain in place until final stabilization has been established and then shall be
<br />removed. Sediment controls may be removed to accommodate short term construction activity but must be
<br />replaced before the next rain.
<br />A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer
<br />of 1 to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with permeable
<br />geotextile fabric. The entrance shall be maintained during construction by top dressing or washing to prevent
<br />tracking or flow of sediments onto public streets, walks or alleys. Potential entrances that are not so protected
<br />shall be closed by fencing to prevent unprotected exit from the site.
<br />DURING CONSTRUCTION:
<br />When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment
<br />laden runoff and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be
<br />seeded with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering
<br />with spray mulch.
<br />A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be
<br />serviced regularly to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from
<br />the site shall in accordance with Minnesota Pollution Control Agency requirements.
<br />A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in
<br />accordance with MPCA requirements.
<br />Concrete trucks must reclaim and recycle all waste concrete.
<br />Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and
<br />repaired as necessary to provide downstream protection.
<br />Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly
<br />be removed.
<br />LE6EYT
<br />F,XI.STING CONTObRr
<br />EXISTING SPOT ELAWMI0.1V
<br />PROPOSED CONTObRr
<br />DRAINAGE' ARROF - FLOF
<br />SILT FE1VCL/STR4#` LOGS
<br />TREE REfOYAL
<br />AS—BUILT ELEVATIONS
<br />TOP OF FOUNDATION = 956.5
<br />TOP OF FOUNDATION = 956.0
<br />955
<br />X 955.5
<br />955
<br />of
<br />0 A
<br />,
<br />09
<br />/ -_-------
<br />00 / - /
<br />ok , / _ _ _/_ Instal/ Silt
<br />Fence'' 951
<br />9
<br />Exis
<br />A* Garage
<br />WlIII M.
<br />j Easement for ingress t _ _^ N , - 01
<br />/ and egress.
<br />R=13.00
<br />L=5.52-'
<br />1 � \
<br />Z=2421'00" \ ++
<br />Q;,
<br />\ \
<br />6" Pine
<br />\
<br />`V t
<br />Cedar
<br />25.61 �sr ���
<br />Q \ l f0" Tree
<br />J
<br />/
<br />i
<br />/
<br />/
<br />I '
<br />1
<br />,
<br />/
<br />Corner of garage,'
<br />is ,1.2 North of the
<br />lad line. Frederick Street
<br />N 90,'00'00" E
<br />/
<br />- - -'33.00
<br />`� ,
<br />inFloor
<br />�-
<br />+/a d -7
<br />05e
<br />Q!oP
<br />N '
<br />O o -
<br />/� co N 8971 06 b
<br />ting
<br />t
<br />(/) \ \ 1B" Tree _ Ex/st. e x I S
<br />i I Q, Ret. ' -Wall ss� I j ng
<br />7 e
<br />r / - Install Silt \ �`SO ` \ ArO� 0" e \ 16 \ . D
<br />Fence `, v v v �v Exist. 1 v
<br />-Conc. Woter `°' r' _
<br />Feature , ti
<br />\aEosemeht for driverxoy �urposes �pe rotd o S
<br />If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock
<br />entrance areas.
<br />Moisture shall be applied to disturbed areas to control dust as needed.
<br />Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained.
<br />.� e5 56..�let. Wall
<br />q�,0 `sem trr r 9- -
<br />O o o
<br />` lI /nsta/l Si/t �� ti
<br />Fence �� �" Wd 116 1
<br />q d3 5 �/`���� " �� EXISt%ng �X
<br />� � OBJ Ret.
<br />Install Rock ', ° '� 5 ' �� 4y X1(2 . e, �1 qo° for hot tub
<br />�� QD Construction ',7T 5 OQ�' �o ` - 94a `"9� 2ga,��� ,e9 52d 1•Z "' X65 Cedar, Tree
<br />Entrance `,N 76'\ 'ra Oo O�h 0
<br />Per Notes OP .00
<br />e.Ot
<br />Q) 6BW- -5.
<br />-
<br />i
<br />- ,► Q A (,l
<br />IN JPO 60
<br />J 6 p 11 pQ V � �9y �e `` - -/ � � _95-
<br />-949
<br />'Prop.
<br />y`-`7i'et. Wa// �� ----------._/ .947
<br />9 , l _948 _ - _ -- _– -
<br />3,
<br />If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile
<br />areas so that the double silt fence around these areas can filter the water before it leaves the site.
<br />Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall
<br />consist of broadcast seeding with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre
<br />followed by covering with spray mulch.
<br />SITE WORK COMPLETION:
<br />When final grading has been completed but before placement of seed or sod an "as built" survey shall be done
<br />per City of Orono requirements to insure that grading was properly done.
<br />When any remedial grading has been completed, sod or seeding shall be completed including any erosion
<br />control blankets for steep areas.
<br />When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of
<br />and adjacent streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and
<br />clean.
<br />/ n `�Propo ao - -- --� ---
<br />- - - - — _ - -
<br />' a� c r Sed Hca "- _� -- _Jt/l. - __94 -A-
<br />-94
<br />A-,
<br />-
<br />94707W*- .-------- _ -_. __----._ - _--944-' ,,"
<br />�4/-------*0 �s -943
<br />47
<br />SF-- _-
<br />+o '-Prop. Ret. Wa//
<br />945
<br />SV
<br />ol
<br />944- - Install Si/t J-
<br />Fence
<br />09,
<br />' �' '�S r �, .►- � 0 j - _ - � — b � � � ;mss`'" / ,�, ' � /
<br />g i / _ ! - �� . ' j9'Q
<br />\IIIA
<br />12" fret'
<br />/ o"i 1500 �� �•,
<br />` 940------ v -
<br />Contour
<br />-
<br />' n
<br />c
<br />RECEIVED
<br />FEB 01 2017
<br />Advance
<br />Surveying & Engineering, Co.
<br />5300 South Hwy. No 101
<br />Minnetonka, Minnesota 55345
<br />Phone (952) 474-7964
<br />Web: www.advsur.com
<br />I HEREBY CERTIFY THAT THIS PLAN, SURVEY OR
<br />REPORT WAS PREPARED BY ME OR UNDER MY
<br />DIRECT SUPERVISION AND THAT I AM A DULY
<br />REGISTERED LAND SURVEYOR UNDER THE LAWS
<br />OF THE STATE OF MINNESOTA.
<br />Wayne W. Preuh
<br /># 43503
<br />LICENSE NO.
<br />FEBRUARY 1, 2017
<br />DATE
<br />I DRAWING ORIENTATION & SCALE
<br />N
<br />M M M
<br />CLIENT NAME /JOB ADDRESS
<br />MURP Y &
<br />CO. DESIGN
<br />2480 CASCO PT. RD.
<br />ORONO, MN
<br />DATE REVISION DESCRIPTION
<br />12/1/20171 FOUNDATION AS—BUILT
<br />DATE SURVEYED: OCTOBER 6, 2015
<br />DATE DRAFTED: AUGUST 19, 2016
<br />nl Ir -PT -ri" r -
<br />FOUNDATION
<br />AS -BUILT
<br />DRAWING NUMBER
<br /># 170035
<br />SHEET NUMBER
<br />S1
<br />SHEET 1 OF 1
<br />
|