Laserfiche WebLink
�q8 60 <br />G QR <br />AV <br />.01001 <br />Ile <br />10001" <br />000, <br />ezel <br />0000�1 <br />.000, <br />As Built Grading Plar <br />Entry llu n <br />C11 <br />-Existinspigg;J, <br />g - — <br />0', _z <br />Heated <br />J <br />Concrete <br />I r <br />0 10 20 30 40 50 FT <br />CP OF ORO- NO <br />—SITE PLAN C4 GRUNGPLAN <br />lEr,APPROVED <br />0 APPROVED WITH REVISIONS <br />01 DISAPP OV <br />BY <br />DATE I <br />RECEIVED <br />DEC 18 2o15 <br />CITY OF ORONO <br />NOTES <br />CRITERIUMA a <br />SCHIMNOWSKI ENGINEUS <br />Paul Schimnowski <br />Criterium-Schimnowski Engineers <br />161 Dunbar Way, Mahtornedi, MN 55115 <br />(651) 779-7700 <br />r)schirnnoa_criteriurn-schimnowsVi corn <br />1 <br />"I hereby certify that this plan, specification, <br />or report was prepared by me or under my <br />direct supervision, and that I am a duly <br />Licensed Professional Engineering under <br />the laws of the State of Minnesota." <br />Paul D Schimnowski, Reg. No. 40126 <br />Date DescrO m - <br />Terra orma <br />'DESIGN <br />H AHN RESIDENCE <br />SCbLE 111=201 <br />DRAM BY <br />D-ECKD BY <br />DATE <br />DATE CF PFUT <br />iv &v 0 � <br />2615 - 0044-1 <br />M-E)Ullf a <br />LONG LAKE/ IIN <br />Temporary Erosion Controf and Sequencing <br />LEGAL 0[-:'_­%CRlPTlr)N OF <br />PIRF-DAISES <br />L <br />lnslQfl perimeter control fencing per the stcindard detail plates. No more than <br />The South 354�75 fee� <br />of the Ea-st 990 feet, except tie North '150 feet of the <br />600 line -or feet of silt fence should be cc)nt`inuQus arid collecting CIL one point. <br />llsimlies" c4 silt fence. <br />East 3213A feel thfreof, <br />of the Southeost Quarter of 'the Southwest Quarter of <br />Uodulalke the silt fence or use or crescents <br />el <br />:�ection 27, Township 116 <br />-1 <br />North, P,-!7qe 23 i'/est of the 5th Prit cipal �Aeridian. <br />3install <br />-1 slope grading <br />Use horizonta <br />ei -05iDn control around any ternporcry dirt stockpile areas. <br />4. <br />The contractor for the project shall inspect all erosion control BK4P' S after <br />e=h rainfall and repro it as necessary unci remove sediment from silt' Fences, <br />Denotes Iron Marker <br />if it rcur-hes 1/3 copacil:Y. <br />5. <br />The contractor shall schedule his operatlon,5 to minimize the amount of <br />oil <br />Denotes Proposed Spot Elevation <br />disturbed urea at any given time, The contractor shall ftit his activities <br />to the QrodIng lin-iits as shown. <br />(a <br />— 920 <br />Denotes Existing Contour Line <br />5. <br />lemove fill ternporary efAP1 s once the site hos reached finol stabilization <br />Liniform perennial vegetative cover with a density of 70 percent over all pervious <br />—920 <br />Denotes Proposed Contour Line <br />surface ureas), <br />Permanent Erosion Controi <br />i. <br />All exposed polls on site must be sl�ab`iilzed with in 3 days: <br />j - 4:1 consists of disc—anchored <br />. Stabilization an slopes Rottor than <br />f L <br />This survey intends to <br />show the boundaries of the obove, described property. <br />mulch and seed; stubilization on slopes flatter than 4:1 and irtl areas <br />Gonsists of erosion blankets and seed, <br />the loccition of an existing <br />"hardcover", <br />house, building, and play house, the Ifocation of <br />ii spot <br />4. 1 <br />of Concentratedfloyis <br />Teporcry rnulch and seed is needed for exposed areas which sit fallow for <br />m7 <br />all visiblF-, <br />orad the proposed location of proposed pool, <br />to <br />._J:1 or steeper in 7 cloys �,i to '10:1 in 14 days, and flatter than, 10:1 in 21 <br />'n,eed <br />elevations, and grades <br />thereon, It dais not purport show any other <br />day's. Also 0[)en stocl,�,Pllle_s' to have terriporqry stabilization V they are to <br />trilprovemients or encroachryient5. <br />renioin inactive for mare than 7 dciys, <br />�q8 60 <br />G QR <br />AV <br />.01001 <br />Ile <br />10001" <br />000, <br />ezel <br />0000�1 <br />.000, <br />As Built Grading Plar <br />Entry llu n <br />C11 <br />-Existinspigg;J, <br />g - — <br />0', _z <br />Heated <br />J <br />Concrete <br />I r <br />0 10 20 30 40 50 FT <br />CP OF ORO- NO <br />—SITE PLAN C4 GRUNGPLAN <br />lEr,APPROVED <br />0 APPROVED WITH REVISIONS <br />01 DISAPP OV <br />BY <br />DATE I <br />RECEIVED <br />DEC 18 2o15 <br />CITY OF ORONO <br />NOTES <br />CRITERIUMA a <br />SCHIMNOWSKI ENGINEUS <br />Paul Schimnowski <br />Criterium-Schimnowski Engineers <br />161 Dunbar Way, Mahtornedi, MN 55115 <br />(651) 779-7700 <br />r)schirnnoa_criteriurn-schimnowsVi corn <br />1 <br />"I hereby certify that this plan, specification, <br />or report was prepared by me or under my <br />direct supervision, and that I am a duly <br />Licensed Professional Engineering under <br />the laws of the State of Minnesota." <br />Paul D Schimnowski, Reg. No. 40126 <br />Date DescrO m - <br />Terra orma <br />'DESIGN <br />H AHN RESIDENCE <br />SCbLE 111=201 <br />DRAM BY <br />D-ECKD BY <br />DATE <br />DATE CF PFUT <br />iv &v 0 � <br />2615 - 0044-1 <br />M-E)Ullf a <br />LONG LAKE/ IIN <br />