�q8 60
<br />G QR
<br />AV
<br />.01001
<br />Ile
<br />10001"
<br />000,
<br />ezel
<br />0000�1
<br />.000,
<br />As Built Grading Plar
<br />Entry llu n
<br />C11
<br />-Existinspigg;J,
<br />g - —
<br />0', _z
<br />Heated
<br />J
<br />Concrete
<br />I r
<br />0 10 20 30 40 50 FT
<br />CP OF ORO- NO
<br />—SITE PLAN C4 GRUNGPLAN
<br />lEr,APPROVED
<br />0 APPROVED WITH REVISIONS
<br />01 DISAPP OV
<br />BY
<br />DATE I
<br />RECEIVED
<br />DEC 18 2o15
<br />CITY OF ORONO
<br />NOTES
<br />CRITERIUMA a
<br />SCHIMNOWSKI ENGINEUS
<br />Paul Schimnowski
<br />Criterium-Schimnowski Engineers
<br />161 Dunbar Way, Mahtornedi, MN 55115
<br />(651) 779-7700
<br />r)schirnnoa_criteriurn-schimnowsVi corn
<br />1
<br />"I hereby certify that this plan, specification,
<br />or report was prepared by me or under my
<br />direct supervision, and that I am a duly
<br />Licensed Professional Engineering under
<br />the laws of the State of Minnesota."
<br />Paul D Schimnowski, Reg. No. 40126
<br />Date DescrO m -
<br />Terra orma
<br />'DESIGN
<br />H AHN RESIDENCE
<br />SCbLE 111=201
<br />DRAM BY
<br />D-ECKD BY
<br />DATE
<br />DATE CF PFUT
<br />iv &v 0 �
<br />2615 - 0044-1
<br />M-E)Ullf a
<br />LONG LAKE/ IIN
<br />Temporary Erosion Controf and Sequencing
<br />LEGAL 0[-:'_%CRlPTlr)N OF
<br />PIRF-DAISES
<br />L
<br />lnslQfl perimeter control fencing per the stcindard detail plates. No more than
<br />The South 354�75 fee�
<br />of the Ea-st 990 feet, except tie North '150 feet of the
<br />600 line -or feet of silt fence should be cc)nt`inuQus arid collecting CIL one point.
<br />llsimlies" c4 silt fence.
<br />East 3213A feel thfreof,
<br />of the Southeost Quarter of 'the Southwest Quarter of
<br />Uodulalke the silt fence or use or crescents
<br />el
<br />:�ection 27, Township 116
<br />-1
<br />North, P,-!7qe 23 i'/est of the 5th Prit cipal �Aeridian.
<br />3install
<br />-1 slope grading
<br />Use horizonta
<br />ei -05iDn control around any ternporcry dirt stockpile areas.
<br />4.
<br />The contractor for the project shall inspect all erosion control BK4P' S after
<br />e=h rainfall and repro it as necessary unci remove sediment from silt' Fences,
<br />Denotes Iron Marker
<br />if it rcur-hes 1/3 copacil:Y.
<br />5.
<br />The contractor shall schedule his operatlon,5 to minimize the amount of
<br />oil
<br />Denotes Proposed Spot Elevation
<br />disturbed urea at any given time, The contractor shall ftit his activities
<br />to the QrodIng lin-iits as shown.
<br />(a
<br />— 920
<br />Denotes Existing Contour Line
<br />5.
<br />lemove fill ternporary efAP1 s once the site hos reached finol stabilization
<br />Liniform perennial vegetative cover with a density of 70 percent over all pervious
<br />—920
<br />Denotes Proposed Contour Line
<br />surface ureas),
<br />Permanent Erosion Controi
<br />i.
<br />All exposed polls on site must be sl�ab`iilzed with in 3 days:
<br />j - 4:1 consists of disc—anchored
<br />. Stabilization an slopes Rottor than
<br />f L
<br />This survey intends to
<br />show the boundaries of the obove, described property.
<br />mulch and seed; stubilization on slopes flatter than 4:1 and irtl areas
<br />Gonsists of erosion blankets and seed,
<br />the loccition of an existing
<br />"hardcover",
<br />house, building, and play house, the Ifocation of
<br />ii spot
<br />4. 1
<br />of Concentratedfloyis
<br />Teporcry rnulch and seed is needed for exposed areas which sit fallow for
<br />m7
<br />all visiblF-,
<br />orad the proposed location of proposed pool,
<br />to
<br />._J:1 or steeper in 7 cloys �,i to '10:1 in 14 days, and flatter than, 10:1 in 21
<br />'n,eed
<br />elevations, and grades
<br />thereon, It dais not purport show any other
<br />day's. Also 0[)en stocl,�,Pllle_s' to have terriporqry stabilization V they are to
<br />trilprovemients or encroachryient5.
<br />renioin inactive for mare than 7 dciys,
<br />�q8 60
<br />G QR
<br />AV
<br />.01001
<br />Ile
<br />10001"
<br />000,
<br />ezel
<br />0000�1
<br />.000,
<br />As Built Grading Plar
<br />Entry llu n
<br />C11
<br />-Existinspigg;J,
<br />g - —
<br />0', _z
<br />Heated
<br />J
<br />Concrete
<br />I r
<br />0 10 20 30 40 50 FT
<br />CP OF ORO- NO
<br />—SITE PLAN C4 GRUNGPLAN
<br />lEr,APPROVED
<br />0 APPROVED WITH REVISIONS
<br />01 DISAPP OV
<br />BY
<br />DATE I
<br />RECEIVED
<br />DEC 18 2o15
<br />CITY OF ORONO
<br />NOTES
<br />CRITERIUMA a
<br />SCHIMNOWSKI ENGINEUS
<br />Paul Schimnowski
<br />Criterium-Schimnowski Engineers
<br />161 Dunbar Way, Mahtornedi, MN 55115
<br />(651) 779-7700
<br />r)schirnnoa_criteriurn-schimnowsVi corn
<br />1
<br />"I hereby certify that this plan, specification,
<br />or report was prepared by me or under my
<br />direct supervision, and that I am a duly
<br />Licensed Professional Engineering under
<br />the laws of the State of Minnesota."
<br />Paul D Schimnowski, Reg. No. 40126
<br />Date DescrO m -
<br />Terra orma
<br />'DESIGN
<br />H AHN RESIDENCE
<br />SCbLE 111=201
<br />DRAM BY
<br />D-ECKD BY
<br />DATE
<br />DATE CF PFUT
<br />iv &v 0 �
<br />2615 - 0044-1
<br />M-E)Ullf a
<br />LONG LAKE/ IIN
<br />
|