My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014 As-Built
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
440 Big Island - PID: 23-117-23-32-0078
>
Survey
>
2014 As-Built
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:13:57 PM
Creation date
12/4/2019 11:26:10 AM
Metadata
Fields
Template:
x Address Old
House Number
440
Street Name
Big Island
Address
440 Big Island
Document Type
Survey
PIN
2311723320078
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY I OF ORONO <br />140044 23/117/23 SUNCREST BUILDERS <br />ADVANCE SURVEYING & ENGINEERING CO. <br />5300 S. Hwy. No. 101 Minnetonka, MN 55345 Phone (952) 474 7964 Fax(952)2250502 www.advsur.com <br />SURVEY FOR: SUNCREST BUILDERS <br />SURVEYED: February 11, 2014 DRAFTED: February 13, 2014 <br />REVISED: Tebruary 19, 2014 to show elimination of retaining walls. <br />REVISED: February 28, 2014 to show items requested by the client. <br />REVISED: April 1, 2014 to show new location of cabin and deck configuration. <br />REVISED: June 25, 2014 to show changes per the city checklist. <br />REVISED: June 25, 2014 to show changes per the city checklist. <br />REVISED: May 12, 2015 to show the final as -built. <br />LEGAL DESCRIPTION: 3 <br />Lots 1, 2 and 3, SCRIVER'S SUBDIVISION OF LOT E MORSE ISLAND PARK and that part of <br />Lot 6, Morse Island Park Second Addition that lies southerly of the following described Line "A": <br />Line "A": Beginning at a point on the east line of said Lot 6 which lies 104.53 feet southerly of the N <br />northeast corner of said Lot 6; thence southwesterly along a straight line to the southwest corner of <br />said Lot 6 and there terminating. - <br />All in Hennepin County, Minnesota. <br />SCOPE OF WORK: <br />1. Showing the length and direction of boundary lines of the above legal description. The <br />scope of our services does not include determining what you own, which is a legal matter. <br />Please check the legal description with your records or consult with competent legal counsel, if <br />necessary, to make sure that it is correct, and that any matters of record, such as easements, that you <br />wish shown on the survey, have been shown. <br />2. Showing the location of existing improvements we deemed important. <br />3. Setting new monuments or verifying old monuments to mark the corners of the property. <br />4. Showing elevations and contours to show the topography of the site. The elevations shown relate <br />only to the benchmark provided on this survey. Use that benchmark and check at least one other <br />feature shown on the map when determining other elevations for use on this site. <br />5. While we show the building setback lines per the City of Orono's web site, we suggest you show <br />this survey to the appropriate city officials to be sure that the setback lines are shown correctly. Do <br />this BEFORE you use this survey to design anything for this site. <br />STANDARD SYMBOLS & CONVENTIONS: <br />" * " Denotes 1/2" ID pipe with plastic plug bearing State License Number 9235, set, unless <br />otherwise noted. <br />CERTIFICATION: <br />I hereby certify that this plan, specification, report or survey was prepared by me or under my direct <br />supervision and that I am a duly Licensed Professional Engineer and Licensed Land Surveyor under <br />the laws of the state of Minnesota. <br />Signature: J . 6DaAA4/t♦ Typed Name: James H. Parker <br />Date: May 12, 2015 Reg. No. 9235 <br />94.1 <br />------------------ <br />-------- <br />-----------------T-- <br />0 <br />Cb <br />GRAPHIC SCALE <br />30 0 15 30 60 <br />( IN FEET ) <br />-----� -" X95io`33_----- <br />f '�+ 9517 <br />111 $'JAY <br />lx946.T X9524 0-4P X950.2 <br />.85'09,'4'` W <br />a 19-25-- ; <br />I � �M '° 4i <br />, <br />----------------- N.E. Cor. Lot 6 <br />L _ <br />C� I <br />\ i <br />LTJ I <br />o! <br />W <br />/ <� �h N <br />0Z <br />Lot 6 <br />, <br />3 + <br />158. 133" W C <br />77'26 ---- <br />` <br />RNP NS <br />RE t, <br />`- P,LEP � IE <br />- l 1 <br />N.O ' <br />6" <br />Z75%4 <br />!}���X976.4 <br />ii974X " <br />--- X974.2 <br />® - p►C ft", FO& <br />LINE 91 A 9 9 <br />Dr w. No. 1510-278 TB <br />414.0 1 <br />Ili <br />204- 00578` <br />(}S- dui!{- Survef/ <br />l <br />5.7------------------------ <br />8\' ,0 .-2 <br />80- '-X' 9-7 <br />- <br />N1 <br />-_-_ <br />-�7 <br />-- <br />w-------- <br />- --_- <br />01 <br />.T\- <br />' a 984-- ----------------_ <br />$ 3 - - -' * In forma tion taken from by Demurs Gabriel to from t <br />Clump\ y _ _ _ _ _ _ _ _ _ _ _ _ _ _ = survey supplied us our c/ien <br />e <br />\ e - <br />LINE 91 A 9 9 <br />Dr w. No. 1510-278 TB <br />414.0 1 <br />Ili <br />204- 00578` <br />(}S- dui!{- Survef/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.