Laserfiche WebLink
• <br /> ft„ ft0 <br /> O CITY OF ORONO <br /> g,, t <br /> • <br /> � �0: ,`, ,. SEPTIC SYSTEM APPROVAL <br /> '4fi _ CITY of ORO 'O <br /> 1.; '� (: Pi�-w>' � ,�, Municipal Offices <br /> 'cAf;f Post Office Box 66 <br /> ZIT <br /> r 'ti <br /> Crystal Bay,Minnesota 523-0066 <br /> S <br /> LOCATION: 4345 Watertown Rd. <br /> OWNER: Don Pearson <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Koch ' s Soil Testing REPORT DATE: May 25, 1994 <br /> The City of Orono has Approved your on-site system design as of August 26, 1994 <br /> (approved-disapproved) (date) <br /> with the following comments: t Ai I_ o a, "101 't AP 'a_. = <br /> s/ <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. . <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF O'O 0 <br /> By /i�.�% / -.�rl/is/ <br /> Stephen` ec a an, On-site Systems Manager <br /> TELEPHONE—473-7357•FAX-473-0510 <br />