Laserfiche WebLink
On the North Shore of <br /> Lake Minnetonka <br /> ON-SITE SEWAGE TREATMENT CITY <br /> INSPECTION REPORTOF POST OFFICE BOX 66 <br /> ORONO 1335 S. Brown Rd. <br /> Crystal Bay, MN 55323 <br /> 473-7357 <br /> Jam <br /> OWNER 337k C7i✓CLd/< ADDRESS 4/v-�' M-he/�1�Gr\ aPERMIT NO.'S. /© DATES 7-4? L O' CONTRACTORS a'/VV." <br /> City Ordinance No. 210 requires that each on-site sewage treatment system in Orono be inspected on a regular basis.The on-site sewage <br /> treatment system at the above address has been inspected and appears to fall into the category checked below. <br /> (This is jii an existing system 0 new construction) <br /> 0 1 Meets or exceeds current City standards in all respects relating to design,construction,and location.Appears to be operating <br /> properly. <br /> U2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br /> located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br /> upgrading of the system is required at this time. <br /> El3 Does not meet current City standards in many respects relating to design,construction,or location.Appears to be operating <br /> adequately at this time,but has a relatively high potential for future problems. No major upgrading of system is required at <br /> this time. <br /> lig4 System may or may not meet current City standards for design,construction or location, but is failing to properly treat and <br /> dispose of the current input,and is endangering a water supply, or is a source of pollution to surface or groundwaters,or is <br /> creating a safety hazard,or is otherwise creating a public nuisance.Please contact the City Inspector to discuss system repair/ <br /> replacement procedures. If drainfield replacement is necessary,soil testing will usually be required,and a design and site plan <br /> must be submitted for review.Your contractor must obtain a permit before work is started. <br /> SYSTEM CONDITION ( m Checked items may require your action) <br /> Tank inspection indicates: 0 Inspection pipe is located directly over tank baffle.(Does not <br /> 1 Pumpout not needed at this time. give accurate measurement of solids accumulation.) If tanks <br /> O Solids accumulation in tanks indicates they should be pump- have not been pumped out within the last three years, they <br /> ed out this year to help prevent future problems. should be pumped out now. <br /> O Solids accumulation in tanks is at a critical level. Tanks Drainfield inspection indicates: <br /> should be pumped out as soon as possible. 0 Drainfield is dry,no surfacing evident. <br /> O System is discharging to surface. Tanks must be pumpedSome evidence of surfacing,not critical yet. <br /> within 48 hours to eliminate surface discharge. 't.Drainfield is saturated—=nd visibly discharging g untreated <br /> O Inspection risers missing—tanks could not be inspected. efflu-• • •• . - •.•. . m• r-.uire re•lace- <br /> Inspection risers (4" dia. pipe)must be installed in each tank ment or additions to drainfi-l. .. - '. Ins.-ctor <br /> at next pumpout. If tanks have not been pumped out within i ii : e . -e•ai .. .... . .' • 90 days. <br /> the last three years,they should be pumped out now. 0 Drainfield extent and condition unknown. <br /> SITE CHARACTERISTICS: <br /> Limiting Site Factors Potential for System Failure Site Capabilities for <br /> ❑ Slope (depends on soil types,water Future Expansion <br /> O Soil table,and system condition) 0 Adequate <br /> O High water table 0 Low ,.,Fair <br /> ❑ Lot size 0 Medium 0 Poor <br /> Lake,wetland,or stream g High 0 Inadequate <br /> Drainage System is causing visible <br /> surface discharge. <br /> COMMENTS: <br /> -.:-.-/(i—v <br /> ...1.,,,- <br /> Date of Inspection eptic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that <br /> this report does not guarantee or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy <br /> of the system under current conditions based on the available information. <br /> This report must be kept on the premises with system location and pumping records. <br /> WHITE COPY/Inspector's File GOLD COPY/Homeowner <br />