My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P09892 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4100 Watertown Road - 31-118-23-14-0011
>
Septic
>
2006-P09892 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:29 PM
Creation date
12/3/2019 11:31:03 AM
Metadata
Fields
Template:
x Address Old
House Number
4100
Street Name
Watertown
Street Type
Road
Address
4100 Watertown Road
Document Type
Septic
PIN
3111823140011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> 1. Determine pump capacity: <br /> -,:A. Gravity distribution <br /> 1. Miniinum'required discharge is 10 gpm <br /> 2. Maximum suggested'discharge is 4S gpm. For other <br /> establishments atleast 10%:greater than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. • <br /> B. Pressure distribution <br /> See pressure distribution work sheet <br /> From A or B. Selected'pump capacity: L 2 gpm <br /> 2. Determine pump headrequirements: <br /> A. Elevation difference between pump and point of discharge? soil treatment system <br /> &point of discharge <br /> Li l7 feet W1°-gig:; I a t <br /> B. Special head requirement?(See Figure at right-Special Head Requirements) total pipe <br /> Iengt <br /> feet ''' <br /> N"' 2A.elevation <br /> inlet ' difference <br /> C. Calculate Friction loss <br /> PIP • <br /> i <br /> 1. Select pipe diameter' -) •-% in ,q <br /> 2. Enter Figure E-9 with gpm(1A or B) and pipe diameter(C1). <br /> Read friction loss in feet per 100 feet from Figure E-9 Special Head Requirements <br /> 7, Vft 100ft of pipe Gravity Distribution 0 ft <br /> Friction Loss / p p pressure Distribution 5 ft <br /> 3. Determine total pipe length from pump discharge to soil treatment r <br /> discharge point.Estimate by adding 25 percent to pipe length for <br /> fitting loss.Total pipe length times 1.25= equivalent pipe length E-9; Friction Loss In Plastic Pipe <br /> 3(.0.S/ feet x 1.25 = 1-461( feet - Per 100 feet <br /> 4. Calculate total friction loss by multiplying friction loss (C2) nominal <br /> in ft/100 ft,by.the equivalentpipe length(C3) and divide by 100. pipe diameter <br /> flow rate 1.5" 2" 3" <br /> = 3. ce ft/100ft x L 6`L +100= 10 ft gpm <br /> D. Total head required isthe sum of elevation difference (A),special 20 2.47 0.73 0.11 <br /> head requirements (B),and total friction loss (C4) 25 3.73 1.11 0.16 <br /> 4 D. ft+ ft+ ) 30 5.23 1.55 0.23 ft= 35 6.96 2.06 0.30 <br /> Total head: a feet 40 8.91 2.64 0,39 <br /> 45 11.07 3.28 0.48 <br /> 3. Pump selection 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> A pump must be selected to deliver at least L-1 9 gpm 60 5.60 0.82 <br /> (1A or B)with at least to feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify that I have completed,this work in accordance with applicable ordinances, :rules and laws. <br /> --- (signature) :::,..7 1-1 (license#) e L) ,C.7-:: (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.