My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00686 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4025 Watertown Road - 31-118-23-41-0012
>
Septic
>
2010-00686 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:59 PM
Creation date
11/25/2019 12:00:36 PM
Metadata
Fields
Template:
x Address Old
House Number
4025
Street Name
Watertown
Street Type
Road
Address
4025 Watertown Road
Document Type
Septic
PIN
3111823410012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uxivaxam wMrxxaeuu <br /> Pump Tank Sizing, Dosing and Float S w GE <br /> TREATMENT <br /> MinnesataPollution and Timer Setting Design Worksheet PROGRAM <br /> Control Agency <br /> DOSING VOLUME <br /> 7. Calculate Minimum Pumpout Volume <br /> Volume of Distribution Piping -Line 17 of the Pressure Distribution Worksheet Gallons <br /> Minimum Pumpout Volume=Volume of Distribution Piping X 5 18.0 X 5 = 9Q Gallons <br /> 8. Calculate Maximum Pumpout Volume (25%of Design Flow) <br /> Design Flow: 6QQ GPD x 0.25 = 150 Gallons <br /> q Dosing Volume=Select a volume for 4-5 doses per day and is between the minimum(Line 7)and maximum 150 Gallons <br /> (Line 8)pumpout volume: <br /> 10. Calculate Doses Per Day =Design Flow/Dosing Volume <br /> 600 - 150 = 4.0 Volume of Liquid in <br /> Doses Per Day <br /> Pipe <br /> 11. Calculate Drainback: <br /> Pipe Liquid <br /> A. Diameter of Supply Pipe= 2 inches Diameter Per Foot <br /> B. Length of Supply Pipe= 400 feet (inches) (Gallons) <br /> 1 0.045 <br /> C. Volume of Liquid Per Lineal Foot of Pipe = 0.170 Gallons 1.25 0.078 <br /> D. Drainback =Length of Supply Pipe X Volume of Liquid Per Lineal Foot of Pipe 1.5 0.110 <br /> 400 1 X 0.170 = 68.0 Gallons 2 0.17 <br /> 3 0.380 <br /> 12. Total Dosing Volume =Dosing Volume (Line 9)minus Drainback (Line 11.D) 4 0.661 <br /> 150 68.0 = EifflGallons <br /> FLOAT AND TIMER SETTINGS <br /> A. TIME/DOSING SETTINGS <br /> 13. Required Flow Rate: <br /> A. From Design (Line 12 of Pressure Distribution Worksheet): GPM <br /> B. Or calculated:GPM=Change in Depth(in)x Gallons Per Inch(Line 2) !Time Interval in Minutes <br /> x 25.0 o = � GPM <br /> 14. Choose a Flow Rate from Line 13.A or 13.6 above. GPM <br /> 15. Calculate TIMER ON setting: <br /> Total Dosing Volume(Line 12)/GPM(Line 14) <br /> Minutes ON <br /> 16. Calculate TIMER OFF setting: <br /> Minutes Per Day(1440)IDoses Per Day(Line 10)- Minutes On(Line 15) <br /> 1440 t}�Q _ Minutes OFF <br /> 17. Measuring from bottom of tank: <br /> Distance to set Pump Off Float=Gallons to Cover Pump(Line 5)/Gallons Per Inch(Line 2): <br /> 250 25.0 = 10 Inches <br />
The URL can be used to link to this page
Your browser does not support the video tag.