Laserfiche WebLink
CONSTRUCTION PERMITS AND INSPECTION FEES <br />Permit Type <br />BUILDING PERMIT <br />Fee <br />Applicable <br />Code Section <br />TOTAL VALUATION <br />FEE* <br />$1.00 to $500 <br />$501.00 to $2,000.00 <br />$2,001.00 to $25,000.00 <br />$25,001.00 to $50,000.00 <br />$50,001.00 to $100,000.00 <br />$100,001.00 to $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$1,000,001.00 and up <br />$26.25 <br />$26.25 for the first $500.00 plus $3.41 for each additional <br />$100.00, or fraction thereof, to and including $2,000.00 <br />$77.40 for the first $2,000.00 plus $15.49 for each additional <br />$1,000.00, or fraction thereof, to and including $25,000.00 <br />$433.67 for the first $25,000.00 plus $11.29 for each additional <br />$1,000.00, or fraction thereof, to and including $50,000.00 <br />$715.92 for the first $50,000.00 plus $7.88 for each additional <br />$1,000.00, or fraction thereof, to and includini; $100,000.00 <br />$1109.92 for the first $100,000.00 plus $6.30 for each additional <br />$1,000.00, or fraction thereof, to and including $500,000.00 <br />$3,629.92 for the first $500,000.00 plus $5.25 for each <br />additional $1,000.00, or fraction thereof, to and including <br />$1,000,000.00 <br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each <br />additional $1,000.00, or fraction thereof <br />* Minimum $50.00 permit fee per City Ordinance <br />Minimum Fee <br />Normal Fee <br />Plan Review Fee: <br />Commercial <br />Residential <br />Building Valuation Standard <br />Retaining Walls <br />$ 50.00 Ord. 216 <br />(per 2008 Building Permit Fee Table Based on Valuation) <br />(per -2014 Building Permit Fee Table Based on Valuation) <br />70% of Building Permit Fee <br />(per Current I.C.B.O. Building Standards/Building Valuation Data) <br />$25.00 minimum <br />2016 Fee Schedule -Page 8 <br />