My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01190 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3955 Watertown Road - 32-118-23-32-0004
>
Septic
>
2014-01190 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:36 PM
Creation date
11/21/2019 12:55:07 PM
Metadata
Fields
Template:
x Address Old
House Number
3955
Street Name
Watertown
Street Type
Road
Address
3955 Watertown Road
Document Type
Septic
PIN
3211823320004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Mote:Mound setbacks are menwred from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.8)X Mound Absorption Rath (1.F)-Absorption Width <br /> 10.0 ft x 2.0 - 20.0 ft <br /> B. For slopes-1X,the Absorption Width Is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width (3.A)-Bed Width (2.111)-ft <br /> 20.0 ft - 10.0 ft 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Clean Sand Lift: 3 feet minus Depth to Uniting Condition 0-C)-Clean Sad Uft (1 ft mMHmum) <br /> 3.0 ft - 1.2 ft - 1.8 ft Design Sand Lift(optional): 711.8 <br /> B. Calculate Upslope Height:Clow Sad Lift (4.A)+rnedlo nkpth (1 ft.)+cover (1 ft.)-Upslope Height <br /> 1.s ft + 1.o ft + 1.o ft- 3.a ft <br /> D-34;Slope Multiplier Table <br /> Lind Slope X 0 I 1 2 3 4 5 ,6 7 8 9 JO Il 12 13 14 15 161 111 1111 191 20121 1221 )11 U1 Al <br /> UP9OPe 3:i 3.00 2.91 1.83 2.15 2.68 2.61 1.54 2.48 2.42 2.76 1.3i 2.26 I.21 2.17 2.13 2.09 1.05 2.03 I.00 1.97 1.95 1.93 1.9! 1.89 1.87 1.85 <br /> Berm Ratio 141 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.44 2.86 2.78 4.10 2.62 1.55 2a8 2.41 2.35 1 L2912.2312,1812,012.0812 03 1.98 1.93 <br /> Lend Slw x 0 I T <br /> 2 1 3 14 1 5 1 6 1 T 1 8 1 9 1101111 111131 141151 16 1 17 1 18 1 19 1 20 1 11 1 22 13 24 15 <br /> ClOVr11510pe3:1 3.00 3.09 3.l9 3.30 3.41 3.53 3.IA3.80 3.95 4.11 4,29 4.48 4.69 4.95 5.24 5.55 5.88 6.24 6.63 7.00 1 7.47 7.93 1 8.42 18.93 9.46 10.02 <br /> Berol Ratio JkI 4.00 4.1T 4.35 4.50 4.%5.00 516 5.56 5.88 6.15 6.b7 7.14 7.69 8.29 8.92 9.57 10.24 10.94 11.67 12.42 13.19 13.99 14.82 15.67 16.54 11.44 <br /> C. Select L43dcpe Berm Multiplier <br /> (based on land slope): 3.33 (figure D-34) <br /> D. Calculate Upslope Berm Width:Multiplier (4.C)X Upslope Mound Height (4.11)-Wope Berm Width <br /> 3.33 ft x 3.a ft - 13.0 ft <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (2.8) X Lad Slope (1.D)+100-Drop (ft) <br /> 10.0 ft X 4.0 x + 100- 0.40 ft <br /> F. Calculate Downslope Mound Height:Upslope Height (4.B)+Drop in Elevation (4.E)-Downslope Height <br /> 3.8 ft + 0.4 0 ft = 4.2 f t <br /> G.Select Downslope Berm Multiplier <br /> (based on land slope): 4.76 (figure D-34) <br /> H.Calculate Downslope Berm Width:Multiplier (4.G)X Domalope Height (4.F)-Dow4nslope Berm Width <br /> 4.76 x 4.2 ft - 20.0 ft <br /> 1. Calculate Minhnum Berm to Cover Absorption Area:Downslope Absorption Width (3.B or 3.C)+4 ft.-ft <br /> 10.0 ft + L_'� ft - 14.0 ft <br /> J. Design Dowtruslope Berm -greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multipper: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)-Endslope Berm Width <br /> 3.00 ft x 4.2 ft - 13.0 ft <br /> M.Calculate Mound Width:Upslope Berm Width(4.D)+Bed Width (2.B)+Downslope Berm Width (4.J)-ft <br /> 13.0 ft + 10.0 ft + 20.0 ft - 43.0 ft <br /> N.Calculate Mound Length:Enddepe Berm Width (4.1.)+Bed Length (2.C)+Endslope Berm Width (4.1.)-ft <br /> 13.0 ft + 63.0 ft + 13.0 ft 89.0 ft <br /> Consists: <br />
The URL can be used to link to this page
Your browser does not support the video tag.