Laserfiche WebLink
t <br /> HA G O <br /> Daily Soil Observation Notes <br /> Project No: Date: ^� (�� y Report No: <br /> Project Name: Project Location: .JV noC� <br /> Client: Temp/Weather: skin Yl�:4 <br /> Project Manager: Time Arrived: Departed: <br /> =i �' 4 S ' i �r27 �r� ,+7a�,— <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes ❑No Report reviewed? ❑Yes []No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ZJ NA ❑Yes ❑No Soils observed agree with Soils report? ❑Yes []No <br /> Soils appear adequate for design loads? ❑Yes [:]No Proposed project bearing capacity(psf): <br /> Contractor notified of results? []Yes ❑No Name of person notified: <br /> Was a copy of this report left on site? Yes ❑No If so,whom was it submitted to? <br /> N <br /> 1 <br /> Notes/Comments: <br /> ' 1 S L <br /> T� .z <br /> c' <br /> Performed By:, Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />