Laserfiche WebLink
r <br /> r <br /> Ventilation, Makeup and Combustion Air <br /> Calculations Submittal Form for New Dwellings <br /> The completed form must be submitted in duplicate at the time of application of a mechanical permit for new construction. <br /> Site address Date ` <br /> Completed By <br /> Contractor I Heating&Cooling Two, Inc. (circle one) AI Hebing Kent Johnston/ <br /> Section A <br /> Ventilation Quality <br /> (Determine quantity by using Table N1104.2 or Equation 11-1) <br /> Square feet(Conditioned area including / <br /> Basement-finished or unfinished) Total required ventilation <br /> Number of bedrooms djZ Continuous ventilation <br /> E) <br /> Directions-Determine the total and continuous ventilatio rate by either using Table N1104.2 or equation 11-1. <br /> The table and equation are below. <br /> Table N1104.2 <br /> Total and Continuous Ventilation Rates(in cfm) <br /> Number of Bedrooms <br /> 1 2 3 4 5 6 <br /> Conditioned Space Total/ Total/ Total/ Total/ Total/ Total/ <br /> (in sq.ft.) continuous continuous continuous continuous continuous continuous <br /> 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 <br /> 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 <br /> 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 <br /> 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 <br /> 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 <br /> 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 <br /> 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 <br /> 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 <br /> 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 <br /> 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 <br /> Equation 11-1 <br /> (0.02 x square feet of conditioned space)+[15 x(number of bedrooms+1))=Total ventilation rate (cfm) <br /> Total ventilation—The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation <br /> rate average,for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV) <br /> and energy recovery ventilators(ERV)the average hourly ventilation capacity must be determined by consideration of <br /> any reduction of exhaust or out outdoor air intake,or both,for defrost or other equipment cycling. <br /> Continuous ventilation-A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm,shall be <br /> provided,on a continuous rate average for each one-hour period.The portion of the mechanical ventilation system <br /> intended to be continuous may have automatic cycling controls providing the average flow rate for each hour is met. <br /> Page 1 of 6 <br />