Laserfiche WebLink
Minnesota Pollution OSTP Design Summary Worksheet UNIVERSITY Control Agency OF MINNESOTA <br /> Pressure Distribution Summary <br /> No.of Perforated Laterals Perforation Spacing C�ft Perforation Diameter In <br /> Lateral Diameter in Supply Pipe Diameter in Minimum Dose Volume I—.J <br /> Flow Rate GPM Total Head F—=ft Maximum Dose Volume 187.5 <br /> Holding Tanks Only <br /> Number of Holding Tanks Total Volume of Holding Tanks gallons <br /> High Level Alarm? <br /> 4. Additional Info for Type IV/Pretreatment Design <br /> Type of Pretreatment unit Being Installed: <br /> Organic Loading to Pretreatment Unit=Design Flow X Estimated BOD in mg/L in the effluent X 8.35 a 1,000,000 <br /> �gpd X C�mg/L X 8.35=1,000,000= Jlbs BOD/day <br /> Calculate System Organic Loading: lbs.BOD/day=Bottom Area =lbs/day/fe <br /> E=Ibs/day= =fe= E=Ibs/day/fe <br /> Comments/Special Design Considerations: <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws. <br /> Joseph J Olson �� 810 01/17/13 <br /> (Designer) f(Signature) (License#) (Date) <br />