My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
11-18-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 10:25:24 AM
Creation date
11/19/2019 9:44:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. Implementation of and adherence to the "Native vegetation and management plan <br /> for the Lakeview Addition"by Prairie Restorations, Inc. dated April 3, 2015 with regards to preservation, <br /> enhamcement. and maintenance of woodlands, upland grass areas,wetlands,pond and stream buffers, and <br /> septic drainfield sites within the Conservation Easement areas. <br /> E. Final Plat approval is subject to Minnehaha Creek Watershed District <br /> ("MCWD") approval and permits as required. The City will not approve the Plat until the MCWD has <br /> approved the stormwater management plans and the Developer has provided evidence that all required <br /> MCWD permits have been obtained. <br /> F. The Plat shall adhere to the purpose and intent of the Orono Community <br /> Management Plan,as amended. <br /> G. The Developer shall establish a homeowners association providing that the <br /> homeowners association will be responsible for all future maintenance of the stormwater ponds and <br /> facilities within the Land. <br /> H. Outlots C and I are not considered as buildable lots until such time that they are <br /> replatted as residential lots. The Developer shall notify and obtain City approval for the future replatting <br /> of Outlots C and I into additional residential lots. Outlot I is intended as a privately owned park that will <br /> be opened to the public. Outlot I will be subject to a perpetual conservation easement with restrictions for <br /> passive park use. Title to Outlot I will be retained by the Lakeview Homeowners Association with <br /> conservation easement granted to Citizens for Lakeview Preservation, Inc. (CLP). Site work will be <br /> completed by SLD contemporaneous with the other Lakeview of Orono improvements. Maintenance of <br /> Outlot I shall be the responsibility of the Lakeview Homeowners Association. The City of Orono does <br /> not intend to own, maintain or accept liability for the private park in Outlot I, which obligations shall be <br /> the sole responsibility of the owners. Improvements to Outlot I shall be limited to the trails indicated on <br /> Plan I, Sheet C-507 as noted in Paragraph 7 of the Agreement; and to the specific signage improvements <br /> described in Exhibit C attached hereto. Developer shall obtain a City permit for the temporary sign, such <br /> sign to be allowed to remain in place for 90 days from the date of installation; and shall obtain a City <br /> permit for the permanent Main Park Sign. The temporary sign and Main Park Sign shall be setback no <br /> less than 10 feet from the street lot line of Outlot I. All other signage described in Exhibit C including <br /> interpretive/educational signs,tree and planting signs, and memorial or dedication signs, shall not require <br /> City permits. <br /> I. All Lots except Lots 20, 21 and 22, Block 3 shall be accessed solely from a <br /> private road system which the Developer shall construct on the Land. Lots 20, 21 and 22, Block 3 shall <br /> be accessed by one driveway each from North Arm Drive.The private road may be designed to preserve <br /> existing vegetation, subject to the approval of the City Engineer. Before the City signs the Plat, the <br /> 180976 6/22/15 mpg 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.