My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
11-18-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 10:25:24 AM
Creation date
11/19/2019 9:44:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW,THEREFORE,Declarant makes this Declaration and hereby declares that this <br /> Declaration shall constitute covenants to run with the Property in perpetuity, and further declares <br /> that the Property shall be owned, used, occupied and conveyed subject to the covenants, <br /> restrictions, easements, charges and liens set forth in this Declaration, all of which shall be <br /> binding on all persons owning or acquiring any right, title or interest in the Property, and their <br /> heirs, successors, personal representatives and assigns. <br /> 1. Shoreline Stabilization. The City shall perform all shoreline stabilization area <br /> activity as shown in Attachments A,B, C,D &E, attached hereto and incorporated herein, and <br /> the City will maintain the shoreline stabilization area as follows: <br /> YEAR 1 <br /> a. Watering will occur as needed to ensure new plantings receive 1-2"of water per week. <br /> When feasible, watering will occur early in the morning and avoided from 12:00 pm to <br /> 5:00 pm. <br /> b. The project area will be inspected for weeds at,least once every two weeks during the <br /> growing season. Weeds will be hand pulled or spot treated with aquatic formulations of <br /> herbicide according to instructions on the herbicide label. <br /> c. Mulch will be added to the project area as needed throughout the growing season to <br /> prevent soil erosion, weed growth,and to hold in soil moisture. <br /> d. Wave barriers and fencing to keep out predators (if applicable) will be maintained as <br /> necessary as plants become established. <br /> e. The City will submit to the MCWD a brief written report that describes the maintenance <br /> activities performed, including dates, locations of inspection,maintenance activities <br /> performed; notes on successful species, weed problems, disturbances issues (animal or <br /> human) and management needs; and photographs of the project area. <br /> YEAR 2 <br /> a. Watering will occur as needed to ensure plantings receive 1" of water per week. When <br /> feasible, watering will occur early in the morning and avoided from 12:00 pm to 5:00 pm. <br /> b. The project area will be inspected for weeds at least once every three weeks during the <br /> growing season. Weeds will be hand pulled or spot treated with aquatic formulations of <br /> herbicide according to instructions on the herbicide label. <br /> c. Mulch will be added to the project area as needed throughout the growing season to <br /> prevent soil erosion,weed growth, and to hold in soil moisture. <br /> 159869v1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.