My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
11-18-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 10:25:24 AM
Creation date
11/19/2019 9:44:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249.4600 <br /> /� r ti� 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4.616 <br /> < c C.' Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> 4kESH04` <br /> December 20,2016 <br /> Ethan Kindseth <br /> Gonyea Homes <br /> 1000 Boone Ave#400 <br /> Golden Valley, MN 55427 <br /> Re: Building Permit Application#2016-01501 <br /> 780 Lakeview Parkway <br /> The City received a building permit application for a new single family home. Staff conducted a preliminary review <br /> based on the information provided and recommends the following items be submitted or revised in order for your <br /> application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. <br /> a. While the height of the house appears to meet City Code standards,please have the surveyor provide <br /> the first floor elevation. <br /> b. Silt fence Is shown to be Installed through the septic sites. Please protect the septic sites and have the <br /> slit fence location modified. After the silt fence has been Installed, please call for an inspection. The <br /> contractor must provide a minimum of a 24-hour notice prior to inspection and before any land <br /> disturbing activities. <br /> 2. Landscape Plan. Prior to the Issuance of the building permit a landscape plan must be submitted showing all <br /> the proposed exterior/landscaping Improvements,i.e.patios,grading,sidewalks,retaining walls,etc. The plan <br /> should include the name of the individual performing the work. Any proposed patios, grading, sidewalks, <br /> retaining walls shown on the landscape plan should also be reflected on the survey. <br /> 3. Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal <br /> of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City <br /> for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee <br /> conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow <br /> amount for this project is $2,500. The escrow agreement is enclosed. The property owner must sign the <br /> enclosed agreement and submit a check for$2,500. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on <br /> the above requirements. <br /> Sincerely,5C OFORONO, <br /> Aft:PK-- <br /> Christine a 'ttson <br /> Planning Assistant <br /> c via email Ethan Kindseth <br /> Dave Pemberton <br /> Roger Peltso,Building Official <br /> enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.