My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-2019 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2019
>
10-21-2019 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 1:14:33 PM
Creation date
11/19/2019 8:21:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION <br />Monday, October 21, 2019 <br />6:30 o'clock p.m. <br />Oakden stated the applicant is requesting approval of an easement vacation in conjunction with <br />establishing a new trail easement. The subject portion of the trail is located along the west side lot at 580 <br />Sandhill Drive in conjunction with establishing a new trail easement. The trail was established within the <br />subdivision and is designed to connect the interior sidewalks to the city sidewalks. During a review of the <br />work, it was recognized that the trail that was installed was outside the easement area. The replacement <br />easement will be the same size but realigned over the existing trail. <br />To date, no public comments have been received. <br />Planning Staff recommends approval of the vacation and new proposed easement. <br />Ressler noted there is already an easement in place, but as it is written, the sidewalk would have to be <br />relocated since it was placed in the wrong place. <br />Oakden stated they could relocate the sidewalk or relocate the easement. <br />Bollis asked if the new easement would impact the setbacks. <br />Oakden indicated it will not. The applicant is working to provide title work to Staff to ensure the <br />easement is recordable against the development. <br />Stephanie Griffin, Excelsior Group, stated she is representing David Weekley Homes. The easement was <br />originally filed. The sidewalk was completed in 2017 at the end of the season and it did not get placed in <br />the correct spot. Redoing the easement would be an easier and simpler process rather than redoing the <br />sidewalk. <br />Chair Ressler opened the public hearing at 7:48 p.m. <br />There were no public comments relating to this application. <br />Chair Ressler closed the public hearing at 7:48 p.m. <br />Ressler noted this easement only impacts one lot. Ressler asked whether the line would change. <br />Oakden noted the line would jog slightly to the west. The sidewalk connects to the outer sidewalk in a <br />slightly different spot, but where it connects with the internal sidewalk system is close to what currently <br />exists. <br />Libby stated he is glad to know the developer is addressing the title work. <br />Griffin stated they do have the title work ready and that the easement will be recorded once approved. <br />Ressler noted there is not opposition by the development or the potential lot owner and that this seems to <br />be a housekeeping item. <br />Erickson moved, Gettman seconded, to recommend approval of Application No. LA19-000079, <br />David Weekley Homes, 580 Sandhill Drive, easement vacation and easement creation. VOTE: <br />Ayes 7, Nays 0. <br />Page 9 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.