Laserfiche WebLink
SEDIMENT LOG WOOD STAKE <br /> SEDIMENT LOG .f <br /> ALTERNATE CUTTINGS TO FORM TAPERED ENDS. ENDS TO WOOD STAKE TO ONLY <br /> OVERLAP IN TRENCH TO LAST TIE FASCINE LENGTH 6.-10". - PENETRATE NETTING. WOOD STAKE TO ONLY <br /> PENETRATE NETTING. <br /> 6" TO 9" DIAMETER BUNDLES CUTTINGS TIED <br /> 't <br /> WIWIFLOW <br /> TH NATURAL TWINE OR RE 12'-1B" O.C. �.1 <br /> SQUARE CUT SOW t�. <br /> A Z MINIMUM OF 2 BUDS <br /> 1/2 UVE STAKES SEE <br /> -- -- EXPOSED ABOVE GROUND <br /> TAMP SOIL AROUND ; <br /> 12 GAUGE WIRE (MIN.) OR WINE WRAPPED ONE 1�4 CUTTING OR LNE STAKE Z <br /> 1\ <br /> TIME MINIMUM PER STAKE, ALTERNATE SIDES <br /> • <br /> - <br /> SQUARE CUT \ G '^ <br /> '4110...'4110... I - / _ y 3/4 ANGLE CUT 30'-45' ., <br /> � �—"�� — " ' �� �\ SIDE VIEW ON SLOPE SIDE VIEW FLAT <br /> ;���=� �v� ����I <br /> L J <br /> UVE CUTTING UVE STAKE <br /> O DETAIL: LIVE FASCINES WOOD STAKE <br /> NOT TO SCALE HARVESTING AND PLACMENT NOTES: SEDIMENT LOG 12" <br /> WOOD STAKE TO ONLY MINIMUM <br /> 1. LIKE STAKES SHALL BE FIELD HARVESTED DORMANT SANDBAR WILLOW PENETRATE NETTING <br /> DEAD (OR LIVE) STAKE INSTALLED THROUGH BUNDLES, 3'-4' O.C. (SAUX INTERIOR) STAKES, HARVESTED AFTER LEAF DROP IN THE FALL <br /> AND BEFORE BUD BREAK IN THE SPRING. ! - /r <br /> FILL FASCINE TO SOIL UNE WITH LOOSE SOIL 2. UVE STAKES SHALL BE 1-2" DIAMETER MINIMUM AND 3' LONG. T <br /> TOP OF STAKES 3"ABOVE FASCINE w 3. THE BRANCHES SHOULD BE RELATIVELY STRAIGHT, WITH NO VISIBLE <br /> 7- e �: <br /> SIGNS OF DISEASE, DAMAGE OR DEFORMITY. <br /> -- ' 4. UVE STAKES SHOULD HAVE ALL SIDE BRANCHES REMOVED. _ <br /> 5. BOTTOM OF LIVE STAKES SHOULD BE CLEANING CUT AT 45 DEGREE OR <br /> SHARPER ANGLE AND THE TOP END SHOULD BE CUT SQUARE. �` <br /> • <br /> w 6. SOAK DORMANT CUTTINGS FOR A MINIMUM OF 24 HOURS IN FLOWING OVERLAP ENDS <br /> jI . , WATER BEFORE PLANTING. 5-7 DAYS OF SOAKING IS IDEAL WOOD STAKE <br /> 7. INSERT UVE STAKE BY HAND. PERPENDICULAR TO GROUND SURFACE, z <br /> ''/' ,,y USING A PILOT HOLE. <br /> �� �` 8. USE A DEAD-BLOW HAMMER TO DRIVE STAKES INTO THE GROUND. <br /> ... l� m <br /> 9. PLACE LIVE STAKES 2' O.C. WHEN IN GROUPINGS. <br /> FRONT VIEW 79P_ DY <br /> ODETAIL: LIVE CUTTINGS OR LIVE STAKES <br /> 0 SECTION: LIVE FASCINES NOT TO ME NOTES: <br /> NOT TO SCALE 1. COMPOST EROSION LOG MATERIALS SHALL COMPLY WITH Mn/DOT STANDARD <br /> SPECIFICATION 3897.2E. <br /> COM& Mani= 2. TNO O GAPS S SURFACE OR BE ENT UNDER <br /> DEBRIS.SEDIMENT LOG. PREPARE AREA AS NEEDED <br /> 1. THE DORMANT CUTTINGS FOR FASCINES SHOULD ONLY BE 7. CONSTRUCT FASCINES FROM LOWEST TO HIGHEST ELEVATION. <br /> INSTALLED DURING THE DORMANT SEASON, AFTER LEAF DROP <br /> IN THE FALL AND BEFORE BUD BREAK IN THE SPRING. 8. INSTALL FASCINES PARALLEL TO CONTOURS, UNLESS <br /> SPECIFIED OTHERWISE. O DETAIL: COMPOST EROSION LOG <br /> 2. LIVE FASCINES ARE LIVE PLANT MATERIALS, HANDLE WITH <br /> CARE. SEE LIVE CUTTINGS DETAIL FOR SIZE. CARE, AND 9. EXCAVATE A HORIZONTAL TRENCH ALONG THE SLOPE. THE NOT TO SCALE <br /> INSTALLATION METHODS. TRENCH SHOULD BE ROUGHLY 2/3 THE DIAMETER OF THE <br /> FASCINE. <br /> PREPARATION, <br /> 10. PLACE BUNDLES IN TRENCH, BACKFILL. COMPACT, AND WATER. <br /> 3. BRANCHES FOR FASCINE SHALL BE Y2"-2" MINIMUM BUTT <br /> il DIAMETER. 11. PLACE WOODEN (OR LIVE) STAKES AT A 3-4' INTERVAL <br /> THROUGH THE CENTER OF THE BUNDLE. LEAVE 3 INCHES EXISTING GRADE <br /> a- SOAK THE LIVE BRANCHES FOR A MINIMUM OF 24 HOURS OF STAKES ABOVE THE BUNDLE- INSTALL FACINE,_,` �„, <br /> (IDEALLY 5-7 DAYS) IN FLOWING WATER BEFORE PLANTING. SEE <br /> Q <br /> R 1 <br /> 5. ASSEMBLE THE WATTLE BY LAYING OUT UVE BRANCHES WITH Nr \\ <br /> .f! THE CUT ENDS PLACED IN OPPOSITE DIRECTIONS IN A LONG I <br /> N 2 SAUSAGE-LIKE BUNDLE. SEED AND MULCH <br /> INSTALL COMPOST ! <br /> 0 0 6. TIE BUNDLES WITH TWINE AT 12"-18" INCREMENTS. FINISHED EROSION LOG, 1 <br /> BUNDLES SHOULD BE 6-9" IN DIAMETER. SEE 6" TOPSOIL I <br /> 7. 2 •Ilir _ 11-11=1\__- =11 <br /> N I 7.71* 7,-,..--. <br /> O <br /> _ .. ._ ..._. . .- . . . . . .,_ .. . JO � ...�... �... <br /> 0 0 yr <br /> 3 <br /> 0 1t'' <br /> T1: E' FROSTING LAKE BED w _ / <br /> $ _ J i. COMMON FILL (COMPACT) <br /> $ 210 24" TYP. Mn/DOT RIPRAP CLASS 111 <br /> E 01 <br /> H e o <br /> \-- <br /> " (SIZE VARIES) MnDOT GRAULAR FILTER (COMPACT) <br /> i <br /> 6" Mn/DOT GRANULAR FILTER <br /> S (CAN SUBSTITUTE GEOTEXTILE FILTER) <br /> Z. <br /> .n MIN 24" DIA. BOULDER BURIED 50% <br /> R <br /> $, 0 DETAIL' RIPRAP TOE PROTECTION <br /> NOT TO SCALE <br /> BARR PROJECT No. <br /> HEREBY CERTIFY THAT THS PAN.SPECIFICATION,°DENT 4/12/16Project OM:.: x�• AS SHOWN BIG ISLAND SHORLINE STABILIZATION 23271464.00 <br /> v OR REPORT WAS PREPARED HY ME OR UNDER MY <br /> o DIREST SVPEMISION AND GINE AM A RDULYERV —CONSTRUCTION BARR 1 4300 MARKETPOINTE DRIVE Drown GWB/LA0 <br /> wLAWS GP THE STATE or MINNESOTA Suite 200 <br /> S' 5 PRINTED wwr,,JEFF WEISS MINNEAPOLIS, MN 55435 ChOSAR4 JOW ORONO, MINNESOTA BANK STABIUZATION DWG. No. REV. No. <br /> Coryorcta/4adQuaR.n: Ph: I-80G-632-2277 0.r5n•d BARR <br /> 3 s SIGNATURE ',...)2,111.)2..-"-... RELEASED A B C 0 1 2 3 Ph. 1aP O0 32-227 Fo/c(952)832-2801 Approved DETAILS AND SPECIFICATIONS <br /> a NO. BY CHK.APP. DATE REVISION DESCRIPTION DATE .✓V". 4UCENSE i 46°31 TO/FOR DATE RELEASED Ph, I-WO-632-2277 w.,..bory.com C-03 A <br />