Laserfiche WebLink
Exhibit C <br />Fact Sheets, Processes and Forms Used in Some Other Municipalities. <br />-i/ 'Golden 'Malley <br />u Custom Search <br />News & City City City Your Home Parks Ir About Golden <br />Events • Government, Departments Services • ar Yard • Recreation • !1 Valley <br />YOU ARE HERE: Homes Your Home & Yards Utilrr�es >I n9ow and Infiltration n Steps For Ill In0 IJ <br />spection © 11 <br />The appointment will take approximately one and one-half hours for residential properties and a n7immum ofthree hours for <br />commercial or muni -unit properties. <br />A responsible adult must be present at all limes during the inspection. <br />4. Prepare For Inspection <br />Before the i nspection, the property -owner must do the following: <br />1. Make sure the water is turned on at the property- The inspection cannot be completed without water. <br />2. Locate the four -inch diameter vertical wastewater pipe that runs down through the basement from a bathroom above. This pipe will <br />have an access point called a cleanout. Cteanouts are usually located on the pipe between approximately six inches and two feet from <br />the basensent floor. <br />3. Make sure the cleanout cover is in working condition before the inspection can be performed. To ensure <br />the cleanoul cover is in swror" condition_ the cover should be loosened and removed. then reinstalled so <br />that a watertight seal is achieved. 91 <br />r <br />4. Make sure the floor area around the cleanout is clear (a five-foot radius). <br />5. It [here is a cleanout cover located on the floor in the basement, [his cover should be in wortdng <br />condition. The inspector may need to gain access to any cleanoul covers located in the basement floor, but _ <br />the inspection cannot be performed through this type of cleanoul. Even if the property owner has a <br />cleanoul cover'located in the floor that is easily accessible and used for sewer cleaning. the inspector must <br />use the cleanout in the vertical four -inch diameter waslewaler pipe. <br />6. It you have a sump,pump, make sure it is accessible for inspection. <br />7. Make sure the sump pump discharge piping is visible. <br />S. Wait For Review <br />Allow up 10 five waking days for the Cay to review the inspection video and issue a compliance certificate or correction notice.. <br />If problems are found <br />1. You will receive a correction notice from the City identifying the problem(s).Repairs should be completed within 180 days of the <br />first inspection. and the City can grant an exlensaon of another 189 days. It repairs are not completed within one year of the fust <br />inspection, the inspeclion becomes invalid and the process starts again, which includes paying the applicable inspection fee. <br />2. Correct fie problems (geeing use correct Inspections for the work dome along the way) and call the Public Works Department to <br />schedule another 919 inspection. tlnflovr & Infltralion Contractor List Jw-j <br />3. If your property is then found compliant., you will receive your compliance certificate. It the property is not compliant after <br />two inspections, an additional applicalian fee ($250 for residential properties: 5750 for commercial properties) may be charged. <br />Steps For Inflow and Infiltration Inspection <br />Inflow and Infiltration <br />Sump Pumps <br />1. Verify Meed For Certification <br />Call the City at 763-5933962 to verity that your property is in need of certification <br />Contact Us <br />before beginning the I!I inspection process. <br />Golden valley Physical <br />2, Submit Application and Pay Fee <br />Development Department— <br />Public Works <br />The applicalian fee is $250 for residential properties and $750 (per building) for <br />78(14 Gclden Valley Rd <br />commercial or multi -unit buildings. <br />Golden tealey, MN 55427 <br />•_ By (Nail or In Person: You can submit your application J- and fee paid 8ycherk <br />Phone: 763-593-8030 <br />via mail or in person all the Public Works Department in C41y Hall. <br />Fax: 763-593-3988 <br />--; Online: Applications may also be submitted online and use fee paid by credit card <br />TTY: 763-593-3%8 <br />(residential application, commercial application). <br />Email Us <br />Please note. water must be available at the property for the inspection to be <br />Office Hours <br />completed. <br />Monday - Friday <br />Sam -4:30 prn <br />3. Schedule Inspection <br />Call 763-593-3962 between 7 am and 3 prn to schedule an inspection. Provide <br />permit number. if application was submitted online., and at least 24-hour advance notice. <br />The appointment will take approximately one and one-half hours for residential properties and a n7immum ofthree hours for <br />commercial or muni -unit properties. <br />A responsible adult must be present at all limes during the inspection. <br />4. Prepare For Inspection <br />Before the i nspection, the property -owner must do the following: <br />1. Make sure the water is turned on at the property- The inspection cannot be completed without water. <br />2. Locate the four -inch diameter vertical wastewater pipe that runs down through the basement from a bathroom above. This pipe will <br />have an access point called a cleanout. Cteanouts are usually located on the pipe between approximately six inches and two feet from <br />the basensent floor. <br />3. Make sure the cleanout cover is in working condition before the inspection can be performed. To ensure <br />the cleanoul cover is in swror" condition_ the cover should be loosened and removed. then reinstalled so <br />that a watertight seal is achieved. 91 <br />r <br />4. Make sure the floor area around the cleanout is clear (a five-foot radius). <br />5. It [here is a cleanout cover located on the floor in the basement, [his cover should be in wortdng <br />condition. The inspector may need to gain access to any cleanoul covers located in the basement floor, but _ <br />the inspection cannot be performed through this type of cleanoul. Even if the property owner has a <br />cleanoul cover'located in the floor that is easily accessible and used for sewer cleaning. the inspector must <br />use the cleanout in the vertical four -inch diameter waslewaler pipe. <br />6. It you have a sump,pump, make sure it is accessible for inspection. <br />7. Make sure the sump pump discharge piping is visible. <br />S. Wait For Review <br />Allow up 10 five waking days for the Cay to review the inspection video and issue a compliance certificate or correction notice.. <br />If problems are found <br />1. You will receive a correction notice from the City identifying the problem(s).Repairs should be completed within 180 days of the <br />first inspection. and the City can grant an exlensaon of another 189 days. It repairs are not completed within one year of the fust <br />inspection, the inspeclion becomes invalid and the process starts again, which includes paying the applicable inspection fee. <br />2. Correct fie problems (geeing use correct Inspections for the work dome along the way) and call the Public Works Department to <br />schedule another 919 inspection. tlnflovr & Infltralion Contractor List Jw-j <br />3. If your property is then found compliant., you will receive your compliance certificate. It the property is not compliant after <br />two inspections, an additional applicalian fee ($250 for residential properties: 5750 for commercial properties) may be charged. <br />