Laserfiche WebLink
icLOAtp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7042 <br /> `ikESHov-`" <br /> • A Variance to Orono Municipal Zoning Code Section 78-1405 for a structural coverage <br /> variance to allow 26.9% building/structural coverage; <br /> • Variances to Orono Municipal Zoning Code Sections 78-350; 78-1279; and 78-1405 for <br /> setback variances to allow: <br /> - 2,103 square feet of building/structure within the 75-foot setback where no structure is <br /> allowed; <br /> - Retaining walls within the 75-foot setback, 32 feet from the OHWL; <br /> - Retaining walls within 10-feet of the paved roadway, 2 feet from the paved road; <br /> - Retaining walls in excess of 2 feet in height within the side yard setback; <br /> - 6.3-foot rear yard setback variance for the principal building where 30-foot setback is <br /> required; <br /> - 41-foot setback from the OHWL for the principal building where a 75-foot setback is <br /> required; <br /> - Driveway width within the 75-foot setback wider than the permitted 8-foot allowance; <br /> and <br /> • An IUP pursuant to Section 78-1726 for removal of approximately 1,120 cubic yards of fill from <br /> the 75-foot setback, subject to the following conditions: <br /> 1. Council approval is based on the entire record, above Findings. <br /> 2. The approved project shall conform to the hardcover calculations and improvements as <br /> shown on the revised site plan dated 10/18/19 submitted by the Applicants and annotated <br /> by City staff, attached to this Resolution as Exhibits A and B. <br /> 3. Any amendments to the plans which are not in conformity with City codes may require <br /> further Planning Commission and City Council review. <br /> 4. No grading within the Hennepin County Regional Rail Authority's (HCRAA) easement is <br /> permitted without HCRR permit/ permission. <br /> 5. To offset the hardcover increases, the plan proposes underground infiltration (French <br /> drains). Applicant shall provide the calculations used to size the system with the <br /> Building Permit submittal. Also a detail of the French drain should be included in the <br /> plan set, and the locations shown on the as-built certificate of survey. <br /> 6. A complete stormwater pollution prevention plan shall be required as part of the building <br /> permit review. <br /> 8 <br />