Laserfiche WebLink
PRESSURE DISTRIBUTION SYSTEM - Trenches <br /> C:cotcnGlc rabnr <br /> e"na3f MI[wc. a!3' <br /> All boxed rectangles must be entered,the rest will be calculated. q" ,r-k <br /> P-f f-ting 3/16."-1/4" <br /> 4'.•rf VtL ming I.SS' <br /> 1. Select number of perforated laterals: 03 <br /> 2. Select perforation spacing = 0ft E4: MmtlmLtrndlowlb4ertunbwofl/4-lnchperforaftm <br /> per lateral>o guaaMee<10%discharge vorlatlon <br /> 3. Since perforations should not be placed closer that 1 foot to pfffaakm <br /> the edge of the rock layer(see diagram), subtract 2 feet from (feen 11nch 1.251rfch 1.5kch ZOlrlch <br /> the rock layer length 2.5 8 14 18 28 <br /> 50 -2ft= 48 ft 3.0 8 13 17 26 <br /> rock layer length 3-3 7 12 1 25 <br /> Y 9 40 � n 1s 5 23 <br /> 5.0 1 6 1 10 1 14 22 <br /> 4 Determine the number of spaces between perforations. <br /> Divide the length (3) by perforation spacing (2) and round down to nearest whole number. <br /> Perforation spacing = 48 ft/ 3 ft= 16 spaces <br /> 5. Number of perforations is equal to one plus the number of perforation spaces (4). <br /> *Check figure E-4 to assure the number of perforations per lateral guarantees <br /> < 10%discharge variation. <br /> 16 spaces+ 1 = 17 perforations/lateral <br /> 6. A. Total number of perforations= perforations per lateral (5) times number of laterals(1). <br /> 17 perfs/lat x 3 laterals = 51 perforations <br /> E-6: Perixa cn Dischape in ppm <br /> B. Calculate the square footage per perforation. <br /> Should be 6-10 s ft/ erf. Does not I to at-grades. perforation diameter <br /> q P apply 9 head Inches <br /> 1. Rock bed area= rock width (ft)x rock length (ft) (feet) 118 3116 7132 1/4 <br /> 10 ft x 50 ft= 500 ft2 1.00 0.18 0.42 0.56 0.74 <br /> 2. Square foot per perforation = Rock Bed Area/number of perfs (6) <br /> 500.0 ft' / 51 perfs = 9.8 ft2/pert 2.0b 0.26 0.59 0.80 1.04 <br /> 5.0 0.41 0.94 1.26 1.65 <br /> 7. Determine required flow rate by multiplying the total number use 1.orc.lfctrsirCa1edarrUy ncrrwt <br /> of perforations(6A) by flow per perforations (see figure E-6) n usp 2.G nkat r,-,.(c;r:1'rr � . <br /> 51 perfs x 1 0.56 gpm/perfs= 28.6 gpm <br /> 8. If laterals are connected to header pipe as shown <br /> in Figure E-1, to select minimum required lateral <br /> diameter; enter figure E-4 with perforation spacing (2) and <br /> number of perforations per lateral (5). <br /> Rgwo E-1:ManHold Looafed of End of Syst*m <br /> Select minimum diameter for perforated laterals= 02 inches <br /> 9. If perforated lateral system is attached to manifold pipeRgwehe Gnfer of the 9ysroE-2:Manifold Looafed " <br /> in tm <br /> near the center, like Figure E-2, perforated lateral length (3) <br /> and number of perforations per lateral (5)will be approximately <br /> one half of that in step 8. Using these values, select - <br /> minimum diameter for perforated lateral = 0 inches. �- <br /> I her erti h t hav completed this work in accordance with all applicable ord' an s, rules and laws. <br /> (signature) �02 (license#) (date) <br />