Laserfiche WebLink
1 <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Tuesday, August 14, 2012 11:29 AM <br /> To: 'Rick Riley' <br /> Cc: Dan McNosky; Mike Dyer; cpladsonjr@aol.com <br /> Subject: RE: 4115 Watertown Rd <br /> Attachments: Building Permit Application Packet for New Structures or Additions.pdf <br /> Hi Rick, <br /> The building permit application should be completed by the company constructing the retaining walls. There <br /> was no contact information on the paperwork I received; therefore I sent it to you as you are the last contractor <br /> contact we have on file for this property. I apologize for my assumption. <br /> We received the engineered plans for the walls on August 8. Attached is a building permit application. A <br /> buildingpermit is required rather than a zoning permit as I previously stated as the walls are require an <br /> engineer's design and review. <br /> Please have a representative from the company constructing the retaining walls complete the application. It <br /> must be submitted with 2 copies of an updated survey showing the proposed walls, noting top and bottom of <br /> walls as well as existing and proposed grades. Our engineer will review and provide any comments, if <br /> necessary. Building permit costs are based on the estimated construction value. An advance plan review fee <br /> will be required when the application is dropped off. For an estimate of the advance plan review fee, please <br /> call our main office at 952-249-4600. <br /> Thank you. <br /> Christine <br /> From: Rick Riley [mailto:RickRiley@Sawhorseusa.com] <br /> Sent: Monday, August 13, 2012 1:27 PM <br /> To: Christine Mattson <br /> Cc: Dan McNosky; Mike Dyer; cpladsonjr@aol.com <br /> Subject: RE: 4115 Watertown Rd <br /> Ms. Mattson, <br /> we assumed that we could ask for a"modification to the prnnnccfl nrnr inn ninn" nnri wni ild not have to nrocess through <br /> another permit process and involve the surveyor....etc.. l 1 _ nd the owner <br /> has expressed and interest in being able to readily acces V) th out concern <br /> for the slope, thus the need for the retaining wall work..... U v v"Y VVVV <br /> Could you please clarify the following; <br /> 1) Do we actually need a new application or can we ask f <br /> 2)The Zoning Permit Application you forwarded would b( ild the <br /> application be filled out by the person doing the retaining <br /> 3) Retaining Wall -as defined on the Zoning Permit Appli )uld be <br /> considered one wall and in the heights shown, would req �— U`� n this permit <br /> application should be completed by the landscape persoi <br /> 4) The ZPA is a $50 permit but also alludes to an Escrom l :rows. Would <br /> additional escrows funds be requested from the city? <br /> Addressing Mr. Struve comments below; <br /> 5)The first two bullet points pertain to the documentation ie hand drawing <br /> submitted. We will ask the surveyor to update a propose <br />