Laserfiche WebLink
CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 <br /> !9 sS G Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kESHO� <br /> 13 September 2016 <br /> Mark Anderson <br /> 3850 Watertown Road <br /> Maple Plain, MN 55359 <br /> RE: Permit#201-00960 Flagpole <br /> Grading CUP #15-3716/Grading Permit#2015-00849 <br /> Mr. Anderson <br /> An as-built survey was submitted on August 19th via email. However, according to a letter sent to you on <br /> August 8th and subsequent follow up emails sent on August 31st(enclosed) we have not yet received all <br /> of the requested information, specifically as noted in the Bolton & Menk letter dated 08/26/16 as follows: <br /> 1. The survey must be revised to show all contours shown on the approved grading plan dated <br /> September 18, 2015. In addition, all improvements that have been made to the property must be <br /> shown. Additional improvements include but are not necessarily limited to the following: <br /> a. Landscaped berm along the west property line; <br /> b. Well and other irrigation features; <br /> c. Fountain; and <br /> d. Limits of gravel surfaces. <br /> 2. Additional detail must be provided for the southwest corner of the property, including contours <br /> into the neighboring property as shown on the approved plan. Additional detail must also be <br /> shown to better define the overflow Swale to Watertown Road. <br /> 3. As shown on the approved plan dated September 18, 2015, the approved wetland boundary <br /> must be shown on the survey along with the 2014 excavated area that was to be restored to the <br /> original elevation of 997.5. <br /> 4. A significant amount of fill has been placed within the approved wetland boundary. Coordinate <br /> with the Minnehaha Creek Watershed for immediate removal and restoration of the wetland. <br /> 5. The landscaped berm constructed along the west property is not an approved improvement. <br /> Although attempts have been made to work with you to restore the drainage patterns along the <br /> berm to pre-project conditions, drainage issues still exist. Therefore, the berm must be <br /> immediately removed and the area must be restored to pre-project conditions. <br /> 6. Provide the cut and fill calculations both in and out of the wetland on the property. <br /> Wetland Credits: In your most recent correspondence you acknowledge that you have put fill in the <br /> wetland. This fill was not authorized, is contrary to your approved plan, and violates the law. Your most <br /> recent correspondence indicates that you will be applying for wetland credits. Please be advised that the <br /> wetland credits will not satisfy the approved plan. The fill must be removed. <br /> On August 29th the City issued a permit for installation of a flagpole on your property. At that time you <br /> were provided with the City's regulations regarding height which you acknowledged. As constructed the <br /> flagpole appears to exceed the maximum 30-foot height limit and must be removed immediately. <br />