My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00230 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3765 Watertown Road - 32-118-23-34-0013
>
Septic
>
2008-00230 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:01 PM
Creation date
10/23/2019 1:47:10 PM
Metadata
Fields
Template:
x Address Old
House Number
3765
Street Name
Watertown
Street Type
Road
Address
3765 Watertown Road
Document Type
Septic
PIN
3211823340013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM Geotextile fabric <br /> er of perforated lateralsuarter inch erforations s acc a fel 3' 1` <br /> :select perforation spacing = _ft of rock <br /> Pert Sizing 3/16"-1/4" <br /> .. ince perforations should noE be laced closer than 1 foot to Perf Spacing, 1.5'-5' <br /> P p <br /> I.lie edge of the rock layer (see diagram),subtract 2 feet from <br /> i he rock layer length. E-4: Maximum ailowable number of 1/4-inch perforations <br /> 37 -2 ft = � ft per lateral to guarantee 40%discharge variation <br /> Rock layer length perforation <br /> 31 - 2- 36- spacing <br /> 4. Determine the number of spaces between perforations. feet 1 inch 1.25 inch 1.5 inch 2.0 inch <br /> i)ivide the length(3)by perforation spacing(2) and round <br /> down to nearest whole number. <br /> ----- 2.5 8 14 18 28 <br /> Perforation spacing= 55 ft_ 3 ft = 2 spaces 3.0 8 13 17 26 <br /> 4po <br /> 3.3 7 12 16 25 <br /> Number of perforations is o11,e plus the nber of <br /> 4.0 7 11 15 23 <br /> perforation spaees(4). Check figure E-4 to assure the number of 5.0 6 10 1 14 1 22 <br /> perforations per lateral guarantees <10% discharge variation. <br /> spaces+ 1 = perforations/lateral E-6: Perforation Discharge in gpm <br /> 6. A. Total�mber of perfora ions= perforations per lateral(5) perforation diameter <br /> tines number of laterals (1) head inches <br /> (feet) 3/16 7/32 1/4 <br /> perfs/gat x 3 lafi= perforations 1,0a .42 0.56 0.74 <br /> I . Calcis e square footage per perf 2.0b 0.59 0.80 1.04 <br /> Recommeded value is 6-10 sqft/perf. Does not apply to at-grades. 4 , <br /> Crock bed area = rock width(ft) x rock length(ft) 5.0 0.94 1.26 1.65 <br /> ft x ft= sgft °Use 1.0 foot for single famlly homes. <br /> Square foot per perforation= Rock bed area+number of perfs (6) b Use 2.0 feet for anythingelse. <br /> __ _sgft_ perfs= sgft/perf <br /> . Determine required flow rate by multiplying the total number of <br /> perforations (6A) by flow per perforation(see figure E-6) n�wpwfw <br /> /moi:%! ✓ {Vo flan P—P <br /> Emu <br /> 3 erfs x gpm/perfs= m <br /> If lilt ra s ar conn o header pipe a upperofaf�, <br /> Of P4� hon,P—P <br /> example, to select minimum required lateral diameter;enter Figure E-1:Manifold Located at End of System <br /> figure E-4 with perforation spacing(2) and number of perforations -- <br /> per lateral (5) Select minimum diameter for <br /> perforated lateral= inches. <br /> F' a E-2:Mangold Located <br /> �1. <br /> if perforated lateral system is attached to manifold pipe near h center of the SysteFn <br /> the center,lower diagram,perforated lateral length(3) and - <br /> number of perforations per lateral (5) will be approximately one <br /> # tllwinfa brofha <br /> half of that in step 8. Using these values,select minimum �= ofd,„h�n,,,,, <br /> diameter for perforated lateral= inches. ' ! P"I x <br /> I hereby certify that I�haavve completed this work in accordance with applicable ordinances, rules and laws. <br /> 1/ ` (signature) (license#) (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.