Laserfiche WebLink
s <br /> CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MIN 55323 <br /> JOB SITE <br /> ADDRESS: �] O CU'A 1 E�2-T tJ 1.-� ZA a <br /> Occupancy Type: Residential Commercial Other <br /> Permit Type: New or Replacement System, $100.00 100,0v <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> `See fee schedule for non-residential permit fees <br /> Owner's Name: eA C e A <br /> Phone Number: Gr7 3 <br /> C�F6T� City: 0�'�'yv � tip: SS <S9 <br /> Mailing Address: <br /> Contractor's Name: �wkd lei w S� {o-F!C� Phone Number: �( <br /> City: d4 <br /> Mailing Address: �tio wria gsn�r� tip: 5a3iB <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. station <br /> D. Final inspection to verify proper final cover depths and to verify e that all pump <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />