Laserfiche WebLink
Date Application Received: 09.18.2019 ��O�O <br /> Date Application Considered as Complete:10.02.2019 <br /> 60-Day Review Period Expires: 12.02.2019 <br /> To: Chair Ressler and Planning Commission Members <br /> Dustin Rief, City Administrator �' <br /> 'kESHO4- <br /> From: Laura Oakden, Planner <br /> Date: October 21, 2019 <br /> Subject: LA19-000083,Jim Cleary Everlast Enterprises Inc., 315 Crestview Ave,Variances, <br /> Public Hearing <br /> Application Summary:The applicant is requesting lot area, lot width, front, and rear setback <br /> variances <br /> Staff Recommendation: Planning Department Staff recommends approval <br /> Background <br /> The applicant is proposing to demolish the existing home and build a new single family home on <br /> 315 Crestview Ave. The applicant is proposing to place the new home at a similar front setback <br /> as neighboring properties.The home will be centered on the lot. The lot abuts a vacant lot to <br /> the north.The applicant is proposing a 2 story home with a full basement. There is an existing 2 <br /> car detached garage on the property that the applicant is proposing to keep. The property is <br /> nonconforming to size at 0.34 acres in the LR-1A, 2 Acre district. <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-305 -Setbacks: <br /> DISTRICT LR-1A Required Proposed <br /> Front 50' 30.2 <br /> Rear 50' 46.3 <br /> Side (North) 12' 32.1 <br /> Side (South) 12' 32.1 <br /> Section78-305-Lot Area/Width: <br /> DISTRICT LR-1A Lot Area Lot Width <br /> Required 87,120 s.f. (2 acres) 200' <br /> Actual 15, 048 s.f. (0.34 acre) 120' <br /> Section 78-1403-Structural Coverage: <br /> Total Lot Area Total Structural Coverage <br /> 15, 048 s.f. (0.34 acre) Allowed: 3,009.6 sq.ft (20%) <br /> Proposed 2,636 s.f. (17.5%) <br /> Section 78-1700-Hardcover Calculations: <br /> Stormwater <br /> Overlay District Total Area in Allowed Existing Proposed <br /> Tier <br /> Zone Hardcover Hardcover Hardcover <br />