Laserfiche WebLink
Dec-05-2003 03:29pm From-CITY OF ORONO +9522494616 T-505 P.001/002 F-224 <br /> CITY OF ORONO SEPTIC SV$TEM PERMIT APPLICATION <br /> Box 66(2754 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> fz yL <br /> JOB SITE ADDRESS <br /> Occupancy Type: Residential Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> epair xisting System S 50.08 <br /> anks or Drainfield) <br /> iP,E Fig, f�d�fiE— 6 "✓�'.S <br /> $0.50 tate surcharge added to above fees <br /> /* See fee schedule for non-residential permit fees <br /> Owner's Name: lwe— ,!J!/T�_ iE�/ Phone Number: _ <br /> Mailing Address: City: Zip <br /> Contractor's Name: Phone Number: <br /> Mailing Address: ,��tAA541WV 141City- Zip: . t1 <br /> *** DO NOT MAIL PAYMENT WITH TRIS APPLICATION*** <br /> ".'NERAL INS'Y'RUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however,permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a lV U- Mesota Pollution Control <br /> Agency(WCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems- <br /> A- Pre-installation site inspection to include inspector, installer,and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drain$eld trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), andagain <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required)components are functional and comply with codes. <br /> 5. Individual holding MPCAYnstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />