My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00553 - new mound system
Orono
>
Property Files
>
Street Address
>
P
>
Pine View Drive
>
1125 Pine View Drive - 28-118-23-42-0007
>
Permits/Inspections
>
2015-00553 - new mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:25:30 PM
Creation date
10/16/2019 10:58:30 AM
Metadata
Fields
Template:
x Address Old
House Number
1125
Street Name
Pine View
Street Type
Drive
Address
1125 Pine View Drive
Document Type
Permits/Inspections
PIN
2811823420007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> r <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License#810 <br /> Riverview Rd. NE, Hanover, MN 55341 <br /> 8-8779 Fax (763) 498-8290 <br /> Revised November 11,2104 ; <br /> July 24 2012110 ,07'NMatthew Nyquist `�• 4 { <br /> 1125 Pine View Drive } <br /> ,13 <br /> Orono,Hennepin County "4 ;- <br /> Z pt <br /> This on-site Sewage Treatment System is designed for a Type 1,five bedroom li x x. e <br /> Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 14"-22"(mottled soil). Due to the periodically saturated <br /> soils,a pressurized mound system will need to be installed to treat the septic effluent.The bottom of the <br /> treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 4 MPI. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the tanks.Clean outs <br /> must be installed on the end of the laterals for maintenance. <br /> The absorption area of the future site does not encroach into the primary site. <br /> A 1300 gallon pumping chamber will need to be installed to lift the effluent to the treatment area.The <br /> power supply and Switches must be located outside the manhole and pumping chamber in a weatherproof <br /> enclosure.A warning device must be installed with light and sound devices;this is in case of a pump <br /> failure.The manifold and supply line must have back drainage to the pumping chamber. <br /> Keep all heavy equipment off of the proposed treatment areas before,during and after construction. <br /> The area around both sites must be fenced off by the contractor before any construction begins. <br /> With proper installation and maintenance,this system should have no problem in treating septic effluent <br /> effectively.Nothing other than gray water,(laundry,showers,etc.)Human water and toilet tissue should be <br /> disposed of into the septic tanks.Garbage disposals are not recommended.Additives must not be used they <br /> may cause harmful damage to your septic system.It is recommended that you pump the septic tanks every <br /> two years. <br /> Sincerely, <br /> ITY OF G 'vim <br /> Joseph J. Olson /; <br /> Date �_ _ � ..... <br /> Pi in Li <br /> For ,. r- r' L,orripnance <br />
The URL can be used to link to this page
Your browser does not support the video tag.