Laserfiche WebLink
A permit was not needed for the pad, according to our landscape designer, but we made sure to <br /> be out of the wetland buffer. To remove/modify the concrete pad after we have spent tens of <br /> thousands of dollars and time to finally finish it puts us in a difficult position. Add on to that, the <br /> traffic situation on our cul-du-sac because of the no left turn on Old Crystal Bay Rd, and this is <br /> more than we can take. <br /> We have been patient and compliant for 3 years waiting and working with the city for things the <br /> developer should have done but blatantly didn't and had no intention of doing right. There must <br /> be some resolution available other than to tear it up because of 5 feet that is already outside the <br /> wetland buffer. <br /> Please help us to find a solution. This was not intentional and like I said, I do not mean to shoot <br /> the messenger but we have had more than we can take and this is the straw that broke the camels <br /> back. We want to be able to enjoy our house and where we live and we thought we were finally <br /> moving past these incredibly frustrating 3 years. <br /> Sincerely, <br /> Jennifer Nyquist <br /> On Sep 19, 2017, at 10:40 AM, Christine Mattson <CMattson@ci.orono.mn.us> <br /> wrote: <br /> Jennifer, <br /> We received an as-built survey for 1125 Pine View Drive and upon review noticed a new <br /> 30' x 45' concrete pad and retaining wall on the survey . The concrete pad is shown 5' <br /> from the wetland buffer and City Code 78-1605 requires a 10' setback. Before the <br /> engineer reviews the as-built survey the concrete pad must be altered to meet the <br /> require 10' setback. Please submit an after-the fact Zoning Permit application to permit <br /> the construction of the concrete pad per City Code 78-967(b) and retaining wall. A copy <br /> of the Zoning Permit is attached. An after-the-fact (double fee) will be applied to the <br /> permit fee. <br /> Please don't hesitate to contact us if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN 155356 (physical address) <br /> PO Box 66 I Crystal Bay I MN 155323-0066 (mailing address) <br /> 952.249.4620 18 952.249.4616 <br /> Pq cmattson@ci.orono.mn.us I ® www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: November 10, 2017 <br /> <Zoning Permit Application- January 2017.pdf <br /> 3 <br />