My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00425 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3465 Watertown Road - 32-118-23-43-0008
>
Septic
>
2016-00425 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:36 PM
Creation date
10/7/2019 2:28:56 PM
Metadata
Fields
Template:
x Address Old
House Number
3465
Street Name
Watertown
Street Type
Road
Address
3465 Watertown Road
Document Type
Septic
PIN
3211823430008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
View images
View plain text
Minnsata Palutlon OSTP Design Summary Worksheet UNIVERSITY <br /> ConbVIAj* r OF MINNESOTA Akt <br /> Mound Design Summary <br /> Absorption Bed Area 625.0 ft2 Bed Length 62.5 ft Bed Width 10.0 ft <br /> Absorption Width 20.0 ft Clean Sand Lift t.2 ft Berm Width (0-1%) ft <br /> Upslope Berm Width 10.0 ft Downslope Berm Width 17.0 ft Endslope Berm Width 11.0 ft <br /> Total System Length &1.5 ft Total System Width 37.0 ft Contour Loading Rate 12.0 gal/ft <br /> At-Grade Design Summary <br /> Absorption Bed Widthft Absorption Bed Length ft System Heightft <br /> Contour Loading Rategal/ft Upstope Berm WidthCft Downslope Berth Widthft <br /> Endslope Berm Width==ft System LengthE=ft System Widthft <br /> Level&Equal Pressure Distribution Summary <br /> No.of Perforated LateralsPerforation Spacing ft Perforation Diameter 7/32 in <br /> Lateral Diameter 2.00 in Min.Delivered Volume� _Jgal Maximum Delivered Volume 188 gal <br /> Non-Lowl and Unequal Prime Dkbibudon Stanmary <br /> Elevation Pipe Volume Pipe Length Perforation Size <br /> (ft) Pipe Size(in) (gal/ft) (ft) (in) Spacing(ft) Spacin;(1n) <br /> Lateral 1 Minimum Delivered Volume <br /> Lateral 2 <br /> gat <br /> Lateral 3 <br /> Lateral 4 Maximum Delivered Volume <br /> Lateral � ]gat <br /> Lateral 6 <br /> 5. Additional Info for Type IV/Pretreatment Design <br /> A. Calculate the organic loading <br /> 1. Organk loading to Pretreatment Unit -Design flow X Estimated BOD in mg/L in the effluent X 8.35+1,000,000 <br /> C ]ww X mg/4 X 8.35+1,000,000- E::=tbs BOD/day <br /> 2. Type of Pretreatment Unit Being Installed: <br /> 3. Calculate Soft Treatment System Organic Loading: BOD concentration after pretreatment+Bottom Area =lbs/day/ft7 <br /> I 3mg/L X 8.35+1,000,000 + =ft2. E=tbs/day/fe <br /> Comments/Special Design Considerations: <br /> 1 hereby certify that I have completed this work i accordance with all applicable ordinances,rotes and laws. <br /> Joseph J Olson 810 09/23/15 <br /> (Designer) (Signature) (License!1) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).