My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00555 - new mound system
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3445 Watertown Road - 32-118-23-43-0009
>
Septic
>
2015-00555 - new mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:38 PM
Creation date
10/7/2019 1:18:33 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
Watertown
Street Type
Road
Address
3445 Watertown Road
Document Type
Septic
PIN
3211823430009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Design Summary Worksheet UNIVERSITY ru �� <br /> Minnesota Pollution OF MINNESOTA <br /> Control Agency <br /> Mound Design Summary <br /> Absorption Area 625.0 ftZ Bed Length 63.0 ft Bed Width 10.0 ft <br /> Absorption Width 12,0 ft Clean Sand Lift 1.2 ft Berm Width (0-1%) ft <br /> Upstope Berm Width 11,0 ft Downslope Berm Width 20.0 ft Endslope Berm Width 11.0 ft <br /> Total System Length 85.0 ft Total System Width 41.0 ft Contour Loading Rate 12.0 gal/ft <br /> At-Grade Design Summary <br /> Absorption Bed Widthft Absorption Bed Length� ft System Height�ft <br /> Contour Loading Rategal/ft Upslope Berm Width� ft Downslope Berm Widthft <br /> Endslope Berm Width E �ft System Length System WidthE=ft <br /> Level it Equal Pressure Distribution Summary <br /> No.of Perforated Laterals Perforation Spacing�ft Perforation Diameter 7/32 in <br /> Lateral Diameter2.00 in Min.Delivered Volume gal Maximum Delivered Volume 188 gal <br /> i <br /> Non-Level and Unequal Pressure Distribution Summary <br /> ! Elevation Pipe Volume Pipe Length Perforation Size <br /> (ft) Pipe Size(in) (gal/ft) (ft) (in) Spacing(ft) Spacing(in) <br /> Lateral 1 Minimum Delivered Volume <br /> Lateral 2 <br /> gal <br /> Lateral 3 <br /> Lateral 4 Maximum Delivered Volume <br /> Lateral 5 <br /> � ]gat <br /> Lateral 6 <br /> 5. Additional info for Type IV/Pretreatment Design <br /> A. Calculate the organic loading using option 1 or 2 <br /> 1. Organic Loading =Pounds of BOD X Units <br /> lbs/day X _ lbs BOD/day <br /> 2. Or Loading to Pretreatment Unit =Design Flow X Estimated BOD in mg/L in the effluent X 8.35=1,000,000 <br /> gpd X mg/L X 8.35=1,000,000= E::::::::I lbs BOD/day <br /> B. Type of Pretreatment Unit Being Installed: <br /> C. Calculate Soil Treatment System Organic Loading: lbs.BOD/day+Bottom Area =lbs/day/ft2 <br /> lbs/day= E�fta= E�tbs/day/ftp <br /> Comments/Special Design Considerations: <br /> i <br /> i <br /> I <br /> I <br /> i <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and taws. <br /> Joseph J Olson � 810 01/14/15 <br /> (Designer) (Signature) (License#) (Date) <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.