My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00555 - new mound system
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3445 Watertown Road - 32-118-23-43-0009
>
Septic
>
2015-00555 - new mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:38 PM
Creation date
10/7/2019 1:18:33 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
Watertown
Street Type
Road
Address
3445 Watertown Road
Document Type
Septic
PIN
3211823430009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ir t <br /> I <br /> I <br /> OSTP Mound Materials Worksheet UNIVERSITY <br /> ! Minnesota PollutionX1,4" <br /> OF MINNESOTA <br /> Control Agency <br /> Project ID: v 06.12.13 <br /> A.Calculate Bed (rock)Volume:Bed Length (2.0)X Bed Width 2.B)X Depth =Volume ft' <br /> 63.0 ft X r 10.0 ft X 1.0 = 630.0 ft3 <br /> jDivide ft3 by 27 ft3/yd3 to calculate cubicyards: <br /> I 630.0 J ft3 27 = 23.3yd3 <br /> i <br /> Add 20%for constructability: 23.3 yd3 X 1.2 = 28.0 yd3 <br /> B. Calculate Clean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Media Length =cubic feet <br /> 1.3 ft X 10.0 ft X 63.0 ft = 829.5 ft3 <br /> i <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> j ft -1) X X ft = <br /> i <br /> Volume from Width=((Upslope hound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X I I X I ft = <br /> Total Clean Sand Volume:Volume from Length+Volume from Width+Volume Under Medio <br /> ft3 + ft3 + ft3 = ft3 <br /> For a Mound on a slope greater than 1% <br /> ! Upslope Volume:((Upslope Mound Height -1)x 3 x Bed Length)+2=cubic feet <br /> i <br /> (( 3.2 ft 1) X 3.0 ft X 63.0 )+2= 204.8 ft3 <br /> I <br /> Downslope Volume:((Downslope Height-1)x Downslope Absorption Width x Media Length)+2=cubic feet <br /> (( 3.5 ft-1) X 16.0 ftX r 63.0 )-2= 1243.2 ft3 <br /> Endslope Volume:(Downslope Mound Height-1)x 3 x Media Width =cubic feet <br /> ( 3.5 ft-1 X 3.0 ft X 10.0 ft = 74.0 ft3 <br /> Total Clean Sand Volume:Upslope Volume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 204.8 ft3 + 1243.2 I ft3 + 74.0 ft3 + 829.5 ft3= 2351.5 ft3 <br /> i <br /> i <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 2351.5 ft3 27 = 87.1 yd3 <br /> Add 20%for constructability: 97= yd3 X 1.2 104.53 <br /> yd <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> ( 3.3 0.5 )ft X 41.0 ft X 85.0 )+2= 4908.0 ft3 <br /> , <br /> Total Mound Volume-Clean Sand volume-Rock Volume=cubic feet <br /> i <br /> ! 4908.0 ft3 _ 2351.5 ft3 _ 630.0 ft3 = 1926.6 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 1926.6 ft3 = 27 = 71.4yd3 <br /> Add 20%for constructability: 71.4 yd3 x 1.2 = 85.6 yd3 <br /> jD.Calculate Topsoil Material Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 41.0 ft X 85.0 ft X 0.5 ft 1742.5 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 1742.5 ft3 27 = 64.5 yd3 <br /> Add 20%for constnx:tabitity: 64.= yd3 x 1.2 = 77.4 yd3 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.