My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00555 - new mound system
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3445 Watertown Road - 32-118-23-43-0009
>
Septic
>
2015-00555 - new mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:38 PM
Creation date
10/7/2019 1:18:33 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
Watertown
Street Type
Road
Address
3445 Watertown Road
Document Type
Septic
PIN
3211823430009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component Length: ft Enter the Component Width: ft <br /> C. Number of Components per Row=Bed Length divided by Component Length (Round up) <br /> ft ft= components/row <br /> D. Actual Bed Length =Number of Components/row X Component Length: <br /> components X ft = �ft <br /> E. Number of Rows=Bed Width divided by Component Width (Round up) <br /> i <br /> ft: ft= rows Adjust width so this is an whole number. <br /> F. Total Number of Components=Number of Components per Row X Number of Rows <br /> X = components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - 1.8 ft = 1.2 ft Design Sand Lift(optional): ft <br /> B. Calculate Upslope Height: Clean Sand Lift +media depth +cover(1 ft.)=Upslope Height <br /> 1.2 ft + 1.0 ft + 1.0 ft= 3.2 ft <br /> C. Select Upstope Berm Multiplier(based on land slope): 3.45 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm M4:1 <br /> 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width:Multiplier X Upslope Mound Height =Upslope Berm Width <br /> 3.45 ft X 3.2 ft = 11.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope=100=Drop (ft) <br /> 10.0 ft X 3.0 % : 100= 0.30 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+Drop in Elevation =Downslope Height <br /> 3.2 ft + 0.30 ft = 3.5 ft <br /> G. Select Downslope Berm Multiplier(based on land slope): 4.54 <br /> Land Slope%W4: <br /> 0 1 2 3 4' E5.00 <br /> 6 7 8 9 10 1 12 <br /> Downslope 3.00 3.09 3.19 3.30 3.41 3 3.66 3.80 3.95-14.11 4.29 4.48 4.69 <br /> Berm Ratio 4.00 4.17 4.35 4.54 4.76 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 4.54 x 3.5 ft ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 16.0 ft + ft = 20.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3.00 ft X 3.5 ft = 11.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width +Bed Width +Downslope Bene Width <br /> 11.0 ft + 10.0 ft + 20.0 ft = 41.0 ft <br /> N. Calculate Mound Length: Endstope Berm Width + Bed Length +Endstope Berm Width <br /> 11.0 J ft + 63.0 ft + 11.0 ft = 85.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.