My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-0169 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3425 Watertown Road - 32-118-23-43-0010
>
Septic
>
2017-0169 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:41 PM
Creation date
10/7/2019 11:50:12 AM
Metadata
Fields
Template:
x Address Old
House Number
3425
Street Name
Watertown
Street Type
Road
Address
3425 Watertown Road
Document Type
Septic
PIN
3211823430010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mound Design Worksheet 21% Slope <br /> 1. SYSTIM sear k. Fife S: SMOM17 <br /> A.Design Row: 600 GPD TABLE UGs <br /> B. Soil Loading Rate: .60 ttt� -ARM . <br /> -Ilam"� '"�' <br /> C. Depth to Limiting Condition: 1.0 T" _ <br /> D.Percent Land Slope: 5.0E. Design Design Media Loading Rate: 1.2 Ife <br /> F.Mound Absorption Ratio- 2.00 ,.z , <br /> 1 b60� 0.O = 1 1A <br /> MOW"O GON'rOilR LA31 t RATES. w» s.ss to i 7 e <br /> Aff,amouw-d Ta.Rb/110-did Ga.1�Yr 10 W OA 2 0.7ti Z <br /> V%wc RaxO OR /110Yf a O✓OfdfP%*"-rag <br /> 1.3.a.0- a..1.2.16 - s 12 <br /> ".rw - <br /> . ...o.- L6_ 5yst- a with dwse values are not Type I systems. Comair <br /> Rate 01mw kmdft rate is a reaommxW value. <br /> 2. DISPERSAL MEDIA SIZING <br /> A. Calculate Dispersal Bed Mea: Design Row=Design Media Loading Rate=fe <br /> ®GPD + PDJR= <br /> If a larger dispersal media area is tiogmo,enter st w. <br /> B. Enter Dispersal Bed Width: t Can not exceed 10 feet <br /> C. Calculate Contour•Load Rate- Bed Width X Design Media Loading Rate <br /> 16- rex 1.2 mme = 1 12.0 jgaUft Can not exceed Table f <br /> D. Caudate Minimum Dispersal BedBed Area +Bed Width =Bed Length <br /> f0.0 ft =r 50.0 Ift <br /> 3. ABSORPTION AREA SIZING <br /> A. Calartate Mgggen WWth: Bed Width X Mound Absorption Ratio =Absorption Width <br /> 10.0 Ift X1 2.0 1 = 27.0 ft(increased from 20) <br /> B. For slopes>1%,the Absorption W kkh is measured downhill from the upstope edge of the Bed. <br /> CalaAate Downslope Absorption Width:Absorption Width -Bed Width <br /> I Z7.0 ft - 10.0 ft = ft <br /> 4. DISTRIBUTION MEDIA:ROCK <br /> A. Rock MM& <br /> aDepthOdn Rhkibution Pipe <br /> in I M5 Ift <br /> 5. MOUND SIZMG <br /> A. Calculate MMimim Clean Sand Lift 3 feet minus Depth to Limiting Condition =Clean Sand lift <br /> 3.0 ft - ft =r__73=j ft Design Sand Lift(optional): ft <br /> B. t:Clean Saeid Lift + of Medi+ of Cover cover(1 ft) <br /> ft + 0.4 ft + 1��[ ft= 1 3.9 Ift <br /> Bean Mtd ori land <br /> Land Slo % O i - 2 3 4 •5 6 3.85 7 8 9 10 11 12 <br /> Llpzlopa Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 1 231 2.26 2.21 <br /> natio 4:1 I 4.00 I 3.85 1 3.70 1 3.S7 I345I 3.33 1 3.23 1 3.12 1 3.03 1 2.94 1 2.86 1 2.78 2.70 <br /> D. CalaAate Upalope Berm Width:Multiplier X Upslope Mand Hei -tW=Berm Width <br /> 3.85 Ift X1 3.9 ft 5.0 Ift <br /> E. Cataate Drop in QWation Under® =Drop <br /> ft X 100=� <br /> ft <br /> F. Caudate Dovmslope Mound Hei t: U rs Height+Drop in IUevation =Dovvnslope Height <br /> 3.9 ft +1 0.50 ft = ft <br /> G.Select Downslope Berm NAtOW(based on land slope): <br /> Land Sb IK O 1 2 3 4 s 6 7 8 9 10 11 12 <br /> Uownslopa 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3 93 4.1i 4_29 4.48 4.69 <br /> Barin Ratio 4:1 4.00 4.17 4.35 4.34 4_76 5.00 5.26 5.56 5.88 6.25 6.67 7.:LA 7.69. <br /> H. to Downslope Berm :11Arr ier X Dow H. t =Downsl Berm VVIdth <br /> X 1 ft = ft <br /> 1. Caurtate Animum Berm to Cover Area: Downslope Absorption Width+4 feet <br /> 17.0 Ift +1 4 Ift ft <br /> J. Design Downslope Berm-greater of 4H and 41: 21.0 Ift <br /> K. Select Endslope Berm Multiplier. (sawlty 3.0 or 4.0) <br /> L. Catculate&KMope Berm X Dow�n-.� Mound Height = Berm Width <br /> L 3 ft X�ft = 15. ft <br /> AL Caudate Mound Width: Berm Width+Bed Width+ Berm Width <br /> .pgM15.0 ft +��_ 1 ft + ft =1 _�ft <br /> N. Galculate Mound Length:P2NM Berm Width +Bed +EnddopeBerFnVAdtJh <br /> 15.0 ft +1 50-V Ift +1 15.0 1 ft = ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.