My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-0169 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3425 Watertown Road - 32-118-23-43-0010
>
Septic
>
2017-0169 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:41 PM
Creation date
10/7/2019 11:50:12 AM
Metadata
Fields
Template:
x Address Old
House Number
3425
Street Name
Watertown
Street Type
Road
Address
3425 Watertown Road
Document Type
Septic
PIN
3211823430010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mound Materials Worksheet <br /> File)1: SD1000317 <br /> A-Calculate Rods Volume:(Rock Below Pipe+Rock to cover cutdde&a+-2 torn))X Bed Length 2.D)X Bed Width (2.6)=Volume ft' <br /> ( 6 in + in 12 X 50.0 ft X 10.0 ft = 250.0 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic <br /> 250.0 ft3 27 = 9.3 yd; <br /> Add 20%for constructability: 9.3 yd3 X 1.2 = 11.1 yd3 <br /> For systems using other distribution media-see product registration for material required <br /> B. Calculate Clean Sand Volume_ <br /> Volume Under Rock bed;Average Sand Depth x Media Width x Media Length =cubic feet _ <br /> 2.1 ftX 10.0 ft X 50.0 ft = 1050.Oft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) <br /> X --- X I <br /> ft <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Total Clean Staid Volume:Volume from Length+Volume from Width+Volume Lkider Media <br /> ft' + ft' + ft' <br /> For a Mound on a slope greater than 1% <br /> Upstope Volume:((Upslope Mound Height-1)x 3 x Bed Length)>2=cubic feet <br /> (( 3.9 it -1) X 3-0 ft X 50.0 )+2= 213.8 ft3 <br /> Downslope Volume:((Downslope Height-1) x Downslope Absorption Width x Media Length)+2=cubic feet <br /> (( 4.4 ft 1) X 17A ft X 50.0 )+2= 1423.8 <br /> Endslope Volume:(Downslope Mound Ffeight-1)x 3 x Meda Width =cubic feet <br /> (1 4.4 ft-1 ) X 3.0 ft X 10.0 ft 100.5 ft3 <br /> Total Clean Sand Volume:Upslope Volume +Downslope Volume +&Mblope Volume+Volume Under Media <br /> 213.8 + 1423.8 11 ft' + 100.5 ft' + 1050.0 ft3= 2788.0 ft1 <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 2788.0 ft3 = 27 = 103.3 yd3 <br /> Add 20%for constructabitity: 1 103-3 yd3 X 1.2 = 123° yd' <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg_Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> ( 4.1 0.5 )ft X 46.0 ft X 80.0 ) 2= 6624.0 ft3 <br /> Total Mound Volume-Clean Sand volume-Rock Volume=cubic feet _ <br /> 6624.0 ft' 2788.0 ft' - I fe = 3586.0 f[' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 3586.0 ft3 a 27 = 132.8 yd3 <br /> Add 20%for corstructabitity: 132.8 1 yd3 x 1.2 = 159.4 yd3 <br /> D.Calculate Topsoil Material Volume:Total Mound Width X Total Mound Length X_5 ft <br /> 46.0 ft X I ft X 0.5 ft = 1840.0 ft3 <br /> Divide ft'by 27 fe/yd3 to calculate cuibic yards: 7`840 1 ft3 a 27 - 68.1 yd3 <br /> Add 20%for constructabitity: 68.1 yd3 x 1.2 = 81.8 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.