My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wetland Information
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0185 Old Crystal Bay Road North - No PID
>
Land Use
>
Wetland Information
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:53 AM
Creation date
9/27/2019 9:45:21 AM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name and/or Number: SER#2014-030-03—185 Old Crystal Bay Road S,Orono <br /> Attachment A <br /> Request for Delineation Review, Wetland Type Determination, or <br /> Jurisdictional Determination <br /> By submission of the enclosed wetland delineation report, I am requesting that the U.S.Army Corps of Engineers,St.Paul District <br /> (Corps)and/or the Wetland Conservation Act Local Government Unit(LGU)provide me with the following(check all that apply): <br /> QWetland Type Confirmation <br /> QDelineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU <br /> concurring, not concurring,or commenting on the boundaries of the aquatic resources delineated on the property.Delineation <br /> concurrences are generally valid for five years unless site conditions change. Under this request alone,the Corps will not address <br /> the jurisdictional status of the aquatic resources on the property,only the boundaries of the resources within the review area <br /> (including wetlands,tributaries,lakes,etc.). <br /> QPreliminary Jurisdictional Determination.A preliminary jurisdictional determination(PJD)is a non-binding written indication <br /> from the Corps that waters,including wetlands, identified on a parcel may be waters of the United States. For purposes of <br /> computation of impacts and compensatory mitigation requirements,a permit decision made on the basis of a PJD will treat all <br /> waters and wetlands in the review area as if they are jurisdictional waters of the U.S. PJDs are advisory in nature and may not be <br /> appealed. <br /> ❑Approved Jurisdictional Determination.An approved jurisdictional determination(AJD)is an official Corps determination that <br /> jurisdictional waters of the United States are either present or absent on the property.AJDs can generally be relied upon by the <br /> affected party for five years.An AJD may be appealed through the Corps administrative appeal process. <br /> In order for the Corps and LGU to process your request,the wetland delineation must be prepared in accordance with the 1987 <br /> Corps of Engineers Wetland Delineation Manual,any approved Regional Supplements to the 1987 Manual,and the Guidelines for <br /> Submitting Wetland Delineations in Minnesota(2013). <br /> http•//www mvp usace army.mil/Missions/Regulatory/DelineationJDGuidance.aspx <br />
The URL can be used to link to this page
Your browser does not support the video tag.