My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer Water Connection Memo_Gaffron
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
130 Brown Road South - PID: 03-117-23-12-0010
>
Land Use
>
Sewer Water Connection Memo_Gaffron
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:05 PM
Creation date
9/26/2019 9:51:37 AM
Metadata
Fields
Template:
x Address Old
House Number
130
Street Name
Brown
Street Type
Road
Street Direction
South
Address
130 Brown Rd S
Document Type
Land Use
PIN
0311723120010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dunn& McCuskey S&W Charges Analysis <br /> April 15,2008/April 7,2009 <br /> Page 6 <br /> $1,600 Long Lake Sewer Connection Charge, a $1,500 Long Lake Water Connection <br /> Charge, and the MCES SAC Charge of$1,67�; but not Long Lake hookup fees. <br /> Creekside Analysis. For Dunn and McCuskey to connect into the Creekside sewer system, <br /> the same basis and formula as used to calculate the Williamson fees would seem to be <br /> applicable. Based on the Enbineer's Estimated Costs dated 2-11-05: <br /> Dunn & McCuskev - Sewer Connection Fee Formula: <br /> 1) Sanitary Sewer Improvements: $49,l 64 $49,164 <br /> 2) 1/2 of Base maintenance roadway costs <br /> $ 2,000 mobilization <br /> $14,000 common excavation <br /> 16,800 Class IV and V Base <br /> 2,250 fabric <br /> $35,050 35,050 <br /> 3) Restaration $]0,000 5,000 <br /> $94,214 <br /> Sewer Connection Fee= $94,214/ ]0 base dwelling units= $9,421 /unit <br /> (Base units=7 in subdiv.Plus 1 McCuskey and 2 Dunn) <br /> Dunn & McCuskey - Water Connection Fee Formula: <br /> 1) Water Main Improvements: $38,906 $38,906 <br /> 2) 1/2 of Base maintenance roadway costs: <br /> � $ 2,000 Mobilization <br /> 14,000 common excavation <br /> 16,800 Class IV and V Base <br /> 2,250 fabric <br /> $35,050 35.050 <br /> 3) Restoration $10,000 10,000 <br /> $83,956 <br /> Water Connection Fee = $83,956 / 10 base dwelling units = $8,396 /unit <br /> (Base units=7 in subdiv. Plus 1 McCuskey and 2 Dunn) <br /> Note: It is unclear whether the old Long Lake S&W fees (paid for the seven Creekside lots <br /> in 2005) apply, or some yet-to-be-agreed-upon new fees apply per the "Sewer and Water <br /> Hook-up and Connection Charge" established in the (still pending) "Municipal Utility <br /> Service Agreement by and between the Cities of Long Lake and Orono". Those fees are <br /> $1,600 per unit for each SAC-equivalent sewer connection and $1,500 for each water <br /> connection (and will there also be "tap fees" of$1100 for water and $1200 for sewer as there <br /> were in 2005?). Orono would collect these at the time of connection permit issuance along <br /> with the standard Met Council SAC charge for sewer connection. The Long Lake connection <br /> fees collected by Orono will be a pass-through to Long Lake. The MCES SAC charge will <br /> continue to be a pass-through to Met Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.