My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer Water Connection Memo_Gaffron
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
130 Brown Road South - PID: 03-117-23-12-0010
>
Land Use
>
Sewer Water Connection Memo_Gaffron
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:33:05 PM
Creation date
9/26/2019 9:51:37 AM
Metadata
Fields
Template:
x Address Old
House Number
130
Street Name
Brown
Street Type
Road
Street Direction
South
Address
130 Brown Rd S
Document Type
Land Use
PIN
0311723120010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dunn& McCuskey S&W Charges Analysis <br /> April 15,2008/April 7,2009 <br /> Page 2 <br /> The Development Agreement also stated that "all applicable City of Long Lake connection <br /> fees and charges associated with the sewer and water system serving the development shall <br /> be paid to Long Lake by the Developer. Developer shall be responsible for any charges to the <br /> City of Orono from the City of Long Lake in relation to the provision of municipal sewer and <br /> water from Long Lake." <br /> On February 14, 2005 Tom Goodrum on behalf of Creekside in Orono LLC paid the City of <br /> Long Lake via check #10855 the amount of$3 7,800 for the seven sewer & water units for <br /> the seven new lots within the Plat of Creekside in Orono, based on the following rates: <br /> Water: Tap fee per unit $1600. <br /> Hookup fee per unit $1100. <br /> Sewer: Tap fee per hookup $1500. <br /> Hookup fee per unit $1200. <br /> Total S&W Fees per unit $�800. <br /> The Development Agreement also stated "As part of the installation of sanitary sewer and <br /> water improvements per the approved plans, Developer shall install two sewer and two water <br /> stubs for future service to the Dunn property and one sewer and one water stub for future <br /> service to the McCuskey property." <br /> No connection fees were paid to Long Lake on behalf of Dunn or McCuskey. Those Long <br /> Lake fees would be due at the time of connection, at whatever rate Long Lake has in effect at <br /> the time of connection. <br /> ANALYSIS <br /> Is an Orono Connection Fee Warranted? The vast majority of City of Orono sewer and <br /> water systems are the result of the City retrofitting existing neighborhoods with sewer and <br /> water lines, assessing the costs of construction back to the benefitin� property owners, <br /> sometimes partially subsidized by the general tax levy. It is a relatively recent phenomenon <br /> in Orono that sewer and water extensions have been installed for new development at the <br /> expense of a developer, and even more recent that such developer-installed systems have the <br /> potential to directly serve adjacent properties without an intervening City project. Eaamples <br /> include Glendale Cove and Creekside. <br /> For City-driven projects, Orono has normally established connection fees for new <br /> connections to an existing City project equivalent to the original per-unit cost of the given <br /> project,plus a� annual inflation factor. For instance, a property connecting in 2008 to the <br /> 1992 Stubbs Bay NE project that was originally assessed $12,630 per unit now would pay <br /> $19,750 as a connection charge if it had never been assessed. <br /> For developer-driven projects, the City has not formally established a policy regarding <br /> appropriate connection fees for additional direct connections of properties outside the <br /> subdivision. There is no precedent direction on this. However, the basis for the CiTy charging <br />
The URL can be used to link to this page
Your browser does not support the video tag.