My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 6 9_8 9 <br />2. Easements shall be provided as required by the City Engineer. <br />3. Significant trees shall be preserved to the extent possible and as shown on the <br />landscaping plans. <br />4. Upon evidence of pre -settlement history, the developer will contact the city and the <br />State Historical Preservation Office prior to proceeding. <br />5. The following estimated fees are due at the time of final plat unless otherwise noted. <br />These fees are based on the 2019 Fee schedule and the fee schedule in effect at the <br />time of Final Plat approval will govern. <br />a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br />and Drainage Trunk Fee (SW&DT Fee) of $48,420.00 (Number of new lots (6) <br />times per lot amount ($8,060). <br />b. Sewer: The costs to construct the Sewer system within the site will be the <br />developers responsibility. The Metropolitan Council SAC charge which is <br />currently $2,485 per dwelling unit will be due at the time of building permit for <br />each lot. The City's sewer charge is $5,225.00 per lot, or $36,575.00. <br />c. Water: The costs to construct the water system will be the developers <br />responsibility. The City's water charge is $29,680.00 ($4,240 per dwelling unit). <br />d. Park dedication: $33,300 ($5,550 x 6 new lots). <br />B. General conditions imposed on preliminary plats shall apply, and are as follow: <br />1. Appropriate traffic control signage within and pertinent to the site shall be installed <br />by the Developer subject to the City Engineer's review and approval. <br />2. Applicant shall demonstrate to the satisfaction of the City Council that all <br />requirements of the Minnehaha Creek Watershed District as administrator of the <br />WCA regulations on Orono's behalf, are complied with. <br />3. Erosion control shall adhere to "Best Management Practices for Protecting Water <br />Quality in Urban Areas" and to the approved SWPPP. All erosion controls as <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.