My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
available to the City, at law or in equity, or under any other agreement, and each and every right, <br />power and remedy herein set forth or otherwise so existing may be exercised from time to time as <br />often and in such order as may be deemed expedient by the City and shall not be a waiver of the <br />right to exercise at any time thereafter any other right, power or remedy. <br />I. The Developer may not assign this Contract without the written permission <br />of the City Council. The Developer's obligations hereunder shall continue in full force and effect <br />even if the Developer sells one or more lots in the Plat, the Land, or any part of it. Upon request, <br />the City shall provide, in recordable form, a release of any lot in the Plat from this Development <br />Contract if the City determines that the terms and conditions of this Contract have been satisfied. <br />J. Developer shall be responsible for all snow removal from vacant lots to the <br />extent that City Ordinance requires snow removal. Developer shall be responsible for ensuring <br />that all vacant lots comply with the City's Code regarding nuisances. <br />K. Retaining walls that require a building permit shall be constructed in <br />accordance with plans and specifications prepared by a structural or geotechnical engineer <br />licensed by the State of Minnesota. Following construction, a certification signed by the design <br />engineer shall be filed with the City Engineer evidencing that the retaining wall was constructed <br />in accordance with the approved plans and specifications. All retaining walls required to be <br />constructed by the Plans, or special conditions referred to in this Contract, shall be constructed <br />before any Certificate of Occupancy is issued for a lot on which a retaining wall is required to be <br />built. <br />L. Developer shall take out and maintain or cause to be taken out and <br />maintained until six (6) months after the City has accepted the public improvements, commercial <br />general liability and property damage insurance covering personal injury, including death, and <br />15 <br />202141v4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.