My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
by the City exceed the amount in escrow and are not promptly reimbursed by the Developer, the <br />City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. <br />Stat. §§ 415.01 and 366.012. The Balance on deposit in the escrow, if any, shall be returned to <br />the Developer when the Development has been completed and written notification is received <br />from the Developer requesting the funds. <br />19. STORM WATER AND DRAINAGE TRUNK FEE. The Land is subject to the <br />standard Storm Water and Drainage Trunk Fee for new 2 -acre lots at $8,060.00 per lot. <br />$8,060.00 per lot x 6 lots = $48,360.00 <br />20. PARK DEDICATION FEE. The Land is subject to the standard Park Dedication <br />Fee requirement at the following rate: <br />$5,550.00 per lot x 6 new lots = $33,300.00 <br />21. SEWER CONNECTION CHARGE. The Land is subject to the standard Sewer <br />Connection Charge at the following rate: <br />$ 5,225.00 per lot x 7 lots = $36,575.00 <br />The Land is subject to the Metropolitan Council SAC Charge at the following rate: <br />$ 2,485.00 per dwelling unit x 7 dwelling units = $17,395.00 <br />22. WATER CONNECTION CHARGE. The Land is subject to the standard Water <br />Connection Charge at the following rate: <br />$ 4,240.00 per dwelling unit x 7 dwelling units = $29,680.00 <br />23. SPECIAL PROVISIONS. The following special provisions shall apply to <br />development of the Land: <br />A. Implementation of and adherence to the findings and conditions listed in (1) <br />Resolution No. approving the Final Plat for Willow Bay Sanctuary, adopted by the Orono <br />City Council on , 2019; (2) Resolution No. 6989 approving the Preliminary <br />Plat for Willow Bay Sanctuary, adopted by the Orono City Council on May 13, 2019. <br />8 <br />202141v4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.