My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If the Developer does not reimburse the City for any cost the City incurred for such work within ten <br />(10) days, the City may draw down the "security" to pay any costs. No development, utility or street <br />construction will be allowed and no building permits will be issued unless the Land is in full <br />compliance with the approved erosion control plan. <br />15. GRADING PLAN. Building permits shall be based on the approved grading and <br />erosion control plan, though actual grading will be completed by the property owners at the time <br />of building construction. This approved grading plan will establish the Engineered Grade for the <br />project, as defined by city code. The City will withhold issuance of building permits until all <br />erosion control measures are in place as determined by the City Engineer. The Developer certifies <br />to the City that all lots with house footings placed on fill will have been monitored and constructed <br />to meet or exceed FHA/HUD 79G specifications. <br />16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted <br />from construction work by the Developer, builders, subcontractors, their agents or assigns. Prior to <br />any construction on the Land, the Developer shall comply with all recommendations of the City <br />staff and City Engineer regarding site cleanup and restoration, including but not limited to <br />contaminated soil removal, junk and debris removal, etc. Also, prior to any construction on the <br />Land, the Developer shall identify in writing a responsible party and schedule for erosion control, <br />street cleaning, and street sweeping. <br />17. CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. Upon <br />completion of the Improvements, the City shall inspect the Improvements and notify Developer <br />if any of the Improvements do not conform to the requirements of this Contract. <br />18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION <br />OBSERVATION. The Developer shall pay a fee for engineering administration. City engineering <br />6 <br />202141v4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.