My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
instructions received from the City's inspectors. The Developer's engineer shall provide for on-site <br />project management. The Developer's engineer is responsible for design changes and contract <br />administration between the Developer and the Developer's contractor. The Developer or its <br />engineer shall schedule a pre -construction meeting at a mutually agreeable time at the City Council <br />chambers with all parties concerned, including the City staff, to review the program for the <br />construction work. Within thirty (30) days after the completion of the Improvements and before the <br />"security" is released, the Developer shall supply the City with a complete set of reproducible "as <br />constructed" Plans, and an electronic file of the "as constructed" Plans in an Auto CAD file or file <br />format approved by the City Engineer based upon the Hennepin County coordinate system, all <br />prepared in accordance with City standards. <br />9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.021 <br />and the Orono City Code, the final placement of iron monuments for all lot corners must be <br />completed before the "security" is released. The Developer's surveyor shall submit a written notice <br />to the City certifying that the monuments have been installed. <br />10. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain all necessary permits, including but not limited to the following to the <br />extent required: <br />• DNR for Dewatering <br />• City of Orono for Building Permits <br />• Minnehaha Creek Watershed District for erosion control permit and storm <br />water management permit <br />• NPDES Permits (National Pollutant Discharge Elimination System) issued by <br />MPCA <br />11. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer's and the Developer's contractors' and subcontractors' <br />responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br />4 <br />202141v4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.