Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />Letter of Credit and escrow to ensure that all site improvements are installed and <br />maintained to the City's specifications and satisfaction, and to establish conditions for <br />future development of the site. <br />6. Payment of development fees as follows: <br />Engineering, City Administration (escrow) $ 4,000.00 <br />Park Dedication Fee 33,300.00 <br />Storm Water and Drainage Trunk Fee 48,360.00 <br />Water Connection Charge 29,680.00 <br />Sewer Connection Charge 36,575.00 <br />Final Plat Fee 500.00 <br />Total Cash Requirements & Fees $152,415.00 <br />WHEREAS, City staff and consultants have reviewed the plans for this subdivision <br />and hereby specify approval of each plan and identify them as part of the official record for Willow <br />Bay Sanctuary, all attached as Exhibit B: <br />Plat of Willow Bay Sanctuary <br />Sheet A: Signature Page <br />Sheet B: Lots 1-3 <br />Sheet C: Lots 4-7 <br />Construction Drawings <br />Sheet 1: Title Sheet (dated 7-10-19) <br />Sheet 2: Existing Conditions (dated 7-10-19) <br />Sheet 3: Grading Plan (dated 7-10-19) <br />Sheet 4: Street Plan & Profile (dated 7-10-19) <br />Sheet 5: Utility Plan and Profile (dated 7-10-19) <br />Sheet 6: Erosion Control and SWPPP (dated 7-10-19) <br />Sheet 7: Detail Sheet (dated 7-10-19) <br />Sheet 7: Detail Sheet (dated 7-10-19) <br />Sheet 9: Detail Sheet (dated 7-10-19) <br />All of the above noted plans are subject to any additional requirements of the Minnehaha Creek <br />Watershed District and the City Engineer. <br />Page 2 of 4 <br />