My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Item No.: <br />Item Description: Sewer Pumps Replacement <br />Date: August 12, 2019 <br />Presenter: Scott Oberaigner Agenda Consent Agenda <br />Utilities Supervisor Section: <br />1. Purpose. The purpose of this council action is to gain council approval to replace sewer <br />pumps at Grinder Station 10. <br />2. Background. This year's lift station inspections have reveled Grinder Station 10's pumps need to be <br />replaced. Both existing pumps have significant wear to the impellers. <br />3. Scope. Replacement of two pumps and accessories and installation at Grinder Stations 10. <br />4. Cost. The cost to replace the 2 pumps is $ 17,000. <br />5. Funding. This equipment will be funded through the Sanitary Sewer Fund. The estimated balance at <br />the end of year 2019 is $1,839,932. There is a positive balance of $18,000 this year from our 2019 Lift <br />Station rehabilitations that will cover the expense of these pump replacements. Also Grinder Station 10 <br />is scheduled for a rehabilitation next year which would have included pump replacement. <br />6. Staff Recommendation. Staff Recommends replacement of the two pumps by Quality Flow <br />Systems. Quality Flows proposal includes KSB pumps which is common to others in our system and <br />includes installation, training and warrantee. <br />COUNCIL ACTION REQUESTED <br />Motion to accept the proposal from Quality Flow Systems Inc for the replacement of four sewer pumps <br />for $ 17,000. <br />Prepared By: SO <br />Reviewed By: <br />Approved By: -TV <br />
The URL can be used to link to this page
Your browser does not support the video tag.