My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2019 Council Packet
Orono
>
City Council
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:55:51 AM
Creation date
9/24/2019 10:48:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION <br />Monday, July 15, 2019 <br />6:30 o'clock p.m. <br />Bollis stated he also is in support of it subject to the information being supplied to the City Engineer and <br />him signing off on it. <br />Gettman noted the Planning Commission is just approving the concept with the caveat that the <br />information is provided to the City Engineer. <br />Ressler stated as long as they are not changing the level of grading, that is what he is after, and that he <br />wants to avoid any sort of approval that would dramatically change the slope. The applicant should stay <br />in compliance with the recommendations of the City Engineer and provide the requested information. If <br />that is done, he would be in support of it. <br />Gettman asked if they should wait until the City Engineer approves the final design before approving the <br />request. <br />Curtis stated only if there is something the Planning Commission feels would change their <br />recommendation on the variance. Staff is asking for more clarification on location and specifications. <br />The City Engineer will not certify it but he will cross-check their engineer, who will be certifying it. <br />Gettman moved, Bollis seconded, to recommend approval of Application No. LA19-000051, Dale <br />Gustafson, 1905 Concordia Street, variance and Interim Use Permit, subject to the appropriate <br />information being provided to the City Engineer and subject to the general grading remaining <br />consistent with what currently exists. VOTE: Ayes 6, Nays 0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.